DB11/T 594.1-2017
地下管线非开挖铺设工程施工及验收技术规程第1部分∶水平定向钻施工
Code for construction and acceptance of underground pipeline project installed by trenchless methodPart I:Construction with horizontal directional drilling methods
2017-07-01实施
2017-03-22发布
目 次
前 言............................................................................... 1
1 范围............................................................................... 1
2 规范性引用文件..................................................................... 1
3 术语和定义......................................................................... 1
4 一般规定........................................................................... 3
5 水平定向钻施工..................................................................... 4
6 工程质量检验及验收................................................................ 12
7 安全与文明施工.................................................................... 16
附录 A(规范性附录) 水平定向钻施工记录表 ........................................... 18
前 言
DB11/T594《地下管线非开挖铺设工程施工及验收技术规程》分为以下三个部分:
——第1部分:水平定向钻施工;
——第2部分:顶管施工;
——第3部分:夯管施工。
本部分为DB11/T 594的第1部分。
本部分按照GB/T 1.1—2009给出的规则起草。
本部分替代DB11/T594.1—2008《地下管线非开挖铺设工程施工及验收技术规程 第1部分:水平定向钻施工》。
本部分与DB11/T 594.1—2008相比,主要变化如下:
——增加了“水平定向钻施工”的“一般要求”(见5.1);
——增加了“管外充填注浆”的规定(见5.10);
——删除了“定向钻进铺设插口式水泥管”的要求(见2008年版5.14.6);
——删除了“接收工作坑”的要求(见2008年版5.10),将该内容与“起始工作坑”合并,归为“工作坑的制作”(见5.4),与“工作坑的回填”对应;
——修改了“工程竣工与验收”(见第6章,2008年版4.11);
——修改了“一般规定”(见第4章,2008年版4.1至4.3);
——修改了“安全与文明施工”(见第7章,2008年版7.15)。
本部分由北京市城市管理委员会和北京市住房和城乡建设委员会提出并归口。