施工技术
CONSTRUCTION TECHNOLOGY
赤石大桥索塔施工过程仿真分析
辛酉阳",王庆峰",郑瑞杰?
2015年6月上第44卷第11期
(1.黄淮学院建筑工程学院,河南
驻马店463000;2.中交第二航务工程局有限公司,潮北武汉430040)
[摘要】结合赤石特大桥索塔工程实际施工节段划分,对索塔施工进行数值分析,分析表明:在索塔施工过程中,根据其结构特点,合理设置对拉和对撑系统,可有效地控制索塔结构在各施工阶段基本处于全截面受压状态,在各个施工工况下整体应力水平较低,结构安全可靠。
【关键词】桥梁工程;斜拉桥;索塔;数值模拟;施工技术
【中图分类号】U448.27
【文献标识码】A
【文章编号】1002-8498(2015)11-0044-03
SimulationAnalysisofCableTowerConstructionProcessforChishiBridge
Xin Youyang',Wang Qingfeng',Zheng Ruijie
(1. School of Civil Engineering and Architecture, Huanghuai University, Zhumadian, He'nan 463000, Ching;
2. CCCC Second Harbour Engineering Co. , Lid. , Wuhan, Hubei 430040, China)
Abstract: Based on construction segment division of cable tower engineering of Chishi Bridge,this paper introduces the numerical analysis of cable tower construction. Analysis results show that reasonable setting of mutual tension and support system can effectively control pressured state with total cross section for cable tower structure at different construction stages according to the structural characteristics,the overall stress level is low,the structure is safe and reliable.
Key words:bridges;cable stayed bridges;cable towers;simulations;construction
1
工程概况
赤石特大桥位于宜章县赤石乡,大桥为四塔3x 380m预应力混凝土斜拉桥,主索塔高近290m、下塔柱高达186m,为目前世界第一跨径高墩四塔混凝土斜拉桥。索塔如图1所示。
索塔塔柱采用变截面混凝土结构,下塔墩采用双曲线造型,断面为空心带凹槽八边形,中塔肢为4 个4.8m×5.0m倾斜混凝土空心柱、上塔肢为2个竖直空心混凝土截面(见图2)。
全塔共设4道横梁,从上往下分别为A,B,C, D,其中A为上横梁,B为中横梁,C,D为下横梁。
2
索塔施工方法
主墩塔座及下塔柱起步段采用搭设脚手架操
作平台进行翻模施工,其余节段采用液压爬模施工。下塔柱内横梁采用支架现浇与塔柱异步施工,
上横梁塔身同步施工。 3计算原则
3.1应力和线形控制目标
【作者简介]辛酉阳,实验师,硕士,E-mail;xinyouyang1982@163,com
[收稿日期】2014-05-27 万方数据
Fig.1
730
4630 上塔柱 499.630 中塔柱 450.730 下塔柱11段 290.730
下塔柱1段 279.000
索塔立面图1
Elevation of cable tower
1)施工过程中,主要荷载组合工况下塔柱各截面拉应力不超过1MPa。
2)对拉系统及水平支撑拆除后,成塔线形和弯矩与设计基本一致。
3.2对拉系统设置原则
下塔柱Ⅱ(标高111.730~171.730m)为2个分离式截面,随着高度的增加向外倾斜,施工过程中