84
DOI :10. 7672/sgjs2014220084
施工技术
CONSTRUCTION TECHNOLOGY
2014年11月下第43卷第22期
某在建工程框架柱混凝土置换施工方案分析
余兴华,吕林?,袁
(1.河南工程学院土木工程学院,河南郑州451191;2.上海正轶建筑设计有限公司,上海200092)
[摘要】某在建框筒结构部分柱强度不足,对比了儿种常用的加固方法,最适合本工程的加固方法为混凝土置换
法;根据本工程实际情况提出了混凝土置换施工的难点及要点,并依据这些难点制订了支撑、施工及监测方案。【关键词]加固;框筒结构;置换;施工方案;分析
[中图分类号]TU746.3
【文献标识码]A
[文章编号】1002-8498(2014)22-0084-03
Analysis on Concrete Replacement Construction Schemes of
SomeFrameColumns of aConstructingBuilding
Yu Xinghua',Lu Lin’,Yuan Min
(1. College of Civil Engineering, He' nan Institute of Engineering, Zhengzhou, He'nan451191, China :
2. Shanghai Zhengyi Architectural Design Co. , Lid. , Shanghai 200092, China)
Abstract: The strength of some frame columns in a constructing frame-tube structure residence was insufficient need to be reinforced. Compared with several common reinforcement methods, the best strengthening method for this project was concrete displacement method. According to the actual situation of the project, the key points and difficult points are presented, and the corresponding bracing scheme, construction scheme and monitor scheme are put out.
Key words : reinforcement; frame-tube structures; replacement; construction scheme; analysis
工程概况 1
某项目为住宅工程,框筒结构,地下3层,地上 47层,屋顶结构标高160.000m,底层层高4.600m,标准层层高3.300m,1~2层间有一夹层,夹层层高 3.200m,平面长37.65m,宽20.20m。18层以下柱混凝土强度等级C60,梁板C30。目前施工至10 层,经检查,发现1~3层部分柱混凝土强度不足,其中2层具体位置如图1所示。ZHZ1,ZHZ2柱2层混凝土强度不足;ZHZ3,ZHZ4柱2,3层混凝土强度不足;ZHZ5柱3层混凝土强度不足。
通过回弹平均值及碳化深度平均值,换算出 ZHZ1~ZHZ5混凝土立方体抗压强度分别为26.9 29.5,26.5,24.9,20.3MPa,均远低于设计值 60MPa。按柱实际强度建立模型进行计算,柱轴压比均超出规范要求。结构安全性等级评定为Du 级,即严重影响整体承载,必须立即采取措施。
处理方案对比 2
混凝土强度不足时,一般采用的处理方法有拆
【作者简介]余兴华,助教,E-mail:yuxinghua9810@163.com[收稿日期]2014-02-18
?-
200 00t
9250 B-B
B-A
8700
8700
11550
6500
@-2
ZHZ1
6.600
@-3
8150 6.600
?s
@-
图1
强度不足柱平面
8100 H 8T00
-
@
006 00g
@@
B-A
Fig. 1The plan of the insufficient strength column
除、加固和置换3种方案,对于本工程,对第3层以上结构拆除后重新施工,不经济且工期长;增大截面法、粘钢、包碳纤维等加固方法,墙柱强度理论上可提高,但难以定量,经加固后的墙柱与其他混凝土墙柱在抗震时的延性不匹配,仍存在一定的安全隐患,且会给用户装修和使用带来不便;采用置换加固技术对1~3层强度不符合设计要求的墙柱混