总第259期 2017年第7期
河北冶金 HEBEI METALLURGY
Total No. 259 2017,Number7
烧结烟气循环流化床一半干法脱硫工艺优化
李鹏,胡进
(河钢集团承钢公司炼铁事业部,河北承德067002)
摘要:详细介绍了循环流化床-半干法脱硫工艺运行过程中存在的脱硫塔内壁易粘结、返灰循环量不足等导致的系统钙硫比偏高、脱硫效率低、运行不稳定等问题,并提出了相应的改进措施。通过对双流体喷枪的改造、返灰循环方式的调整等措施,实现了半干法脱硫工艺的稳定运行及烧结烟气的达标排放。关键词:循环流化床-半干法脱硫:塔壁粘结:喷枪;返灰方式:调整
中图分类号:X756
文献标识码:B
doi:10. 13630/j. cnki. 13 1172.2017.0719
文章编号:10065008(2017)07007204
OPTIMIZATIONOFCIRCULATINGFLUIDIZEDBED
HALF-DRYDESUFURIZATIONPROCESSOFSINTERING
Li Peng, Hu Jin
( Iron Making Plant, HBIS Steel Chengsteel Company, Chengde, Hebei , 067002)
Abstract : The inner wall of desulfurization tower is easy to bond and the ash returning circulating amount is insufficient during the circulating fluidized bed half dry desulphurization process, which leads to the high ratio of calcium/ sulfur, low desulfurization efficiency, and unstable operation. And the corresponding improvement measures were put forward. The stable operation of half dry desulfurization process and the standard discharge of sintering flue gas had been realized through the modification of the double fluid lance and the adjustment of the circulation mode of ash returning-
Key Words : circulating fluidized bed half dry desulfurization, bingding tower wall; spray gun; ash -returning method; adjustment
0
引言
随着环保形势的目益严峻,如何保证脱硫系统
的安全稳定运行显得越来越重要。脱硫剂湿法消化、循环流化床一半于法脱硫工艺具有投资少、运行费用低等优点,但也同样存在脱硫塔内壁易粘结、返灭循环量低等造成的钙硫比偏高、脱硫效率低及运行不稳定等缺点。相对工艺技术较为成熟的湿法脱硫而言,通过技术改造及工艺优化解决上述问题显得尤为重要。
运行中存在的主要问题
1 1.1
脱硫塔粘结
该工艺采用双流体喷枪实现向塔内喷人消石灰
浆液及冷却水。由于喷枪角度及位置不合理、脱硫收稿日期:2017-04-05
作者简介:李鹏(1984-),男,工程师,2007年毕业于兰州理工大学冶金工程专业,现在河钢集团承钢公司炼铁事业部主要从事脱硫技术工作,Email;29250114@qq.com
72
万方数据
塔人口烟气温度过高导致喷水量过大等原因,造成脱硫塔内壁粘结。粘结最厚处达3m左右,严重影响了脱硫塔内的气流分布及烟气流速,造成脱硫效率急剧降低。粘结物脱落还会造成喷枪砸弯、脱硫塔底部锥斗堵塞等一系列问题,不利于脱硫的稳定运行。
1.2返灰循环量不足
由于匹配增压风机能力偏小、烧结机漏风率过大等原因,造成脱硫塔文丘里下部压力过低,限制了返灰的循环量,且经常性发生塌床,返灰不能实现高倍率循环,造成资源浪费的同时,塌床易造成扬尘污染。 1.3浆液泵磨损严重
设计浆液泵为扬程100m、流量15m/h,而实际脱硫塔喷浆位置与浆液泵的实际高度差为30m 左右,浆液泵扬程严重不匹配,造成浆液泵及管道内部压力偏高,浆液泵壳体及叶轮磨损严重。