2012年10月上第41卷第374期
施工技术
CONSTRUCTION TECHNOLOGY
人工挖孔桩与土钉墙组合支护技术在泥岩地区
旋流池工程中的应用
赵建立,吴彦俊,张凤勇
(中冶天工上海十三冶建设有限公司,上海
201900)
【摘要】在某旋流池基坑工程中,采用了人工挖孔桩与土钉墙组合支护技术。介绍了工程难点,然后详细介绍了支护结构、排水形式及旋流池施工工序,最后通过监测数据分析了周围构筑物的变形情况。与地下连续墙和内衬墙
的支护形式相比,采用该技术能够有效加快施工进度,降低成本,取得了良好的社会效益和经济效益。【关键调】地下工程;基坑;泥岩;旋流池;桩;土钉墙;监测
[中图分类号】TU753.3
【文献标识码】A
[文章编号】1002-8498(2012)19-0031-03
Application of Combined Manual Hole DiggingPile and Soil Nailing Wall Supporting in Whirling Pool Construction in Mudstone Region
Zhao Jianli,Wu Yanjun,Zhang Fengyong
(CMTCC Shanghai Shisanye Construction Co.,Lad., Shanghai 201900, China)
Abstract: Supporting technology combined manual hole digging pile with soil nailing wall was adopted in a whirling pool foundation excavation. The difficulties in construction were introduced. Supporting structure, drainage forms and construction process were also discussed in detail. Finally, the authors analyzed the deformation of structures nearby according to the monitoring data. Compared with the support structure of diaphragm wall and interior wall, this technology can accelerate construction process, reduce the cost and obtain good social and economic benefits.
Key words:underground;foundation excavation; mudstone; whirling pool; piles; soil nailing wall; monitoring
1
工程概况
某旋流池筒体直径16.6m,底板垫层底标高
-24.800m,基底为中风化泥质砂岩。旋流池基坑周边环境复杂,基坑周围的构筑物与管线分布情况如图1所示。基坑距最近的管线仅2.6m,且所有管线埋深均<2.0m。基坑距南侧排洪沟2.0m,排洪沟沟底标高约-6.000m。周边其他构筑物均在基坑开挖影响范围内。
旋流池基坑所在位置的土层自上而下由黏土层向砂质泥层过渡。建设场地地下水类型为浅层潜水,主要赋存于上部素填土层内。地下水主要接受大气降水、地表水和地下径滇的补给,以地下径流和蒸发方式排泄。
2
工程难点
【收稿日期】2012-02-04
【基金项目】中冶天工上海十三冶建筑分公司科研专项基金资助(2010-KY-1)
【作者简介】赵建立,工程师,博士,E-mail:zhaojianli_sjtu@163.com
沉池 19.800
000
7.1m 0325x10钢管
管 15.0 混酸土道路混凝土托架 24.8008300 围护结构
管
线
二总降
管线
泵房
北
3.500
6.8m
管
线
管线
图1旋流池周边管线分布示意
31
Fig.1 Distribution of pipelines around the whirling pool
1)基坑开挖较深,达24.8m。开挖深度范围内,土体由软土层向岩层过渡,且岩层有水即软化的性质,容易在施工期间发生岩体脱落。