2004沿海编制规定及定额与2014内河编制规定及
定额差异分析
工程项目管理
TheAnalysis of theDifferenceBetween Regulations and Quota on Preparation of Budgetfor ConstructionWorksforCoastalPortTransportation in 2o04 andInland
RiverTransportation in 2014
李中艳
(中交第二航务工程勘察设计院有限公司,武汉430071)
LI Zhong-yan
(CCCC Second Harbor Consultants Co.Lid.,Wuhan 430071,China)
【摘要]对交通部交水发[2004)247号文发布的(沿海港口建设工程概算预算编制规定》及相关定额和《内河航遂建设工程概算预算编制规定》(JTS116-1-2014)及相关定额的差异进行比较,并以江西神华九江电厂新建工程配套码头工程为例,比较不网定额计算所得的费用高低。
[Abstract ]The Ministry of transportation No. [2004]247 issued " regulations on preparation ofbudget for construction works for sa pue[u soy som coannsuos og raapnq jo uogeedad o suogengai pue jonb seaaar pueuogeuodsuen od eseoo transportation"(JTS 116-1-2014) and relevant quota to compare the differences, and taking the auxiliary wharfengineering ofJiangxi
Shenhua Jiujiangpowerplantasan example,comparisondifferent from thecostquotacalculation【关键词】沿海港口建设工程编制规定;内河航运建设工程编制规定;定额差异分析
[Keywords Jregulations on preparation ofbudget for construction works for coastal transportation;regulations on preparation of budget forconstruction worksforinlandrivertransportation;different analysisofthequotecalculation
【中图分类号]U656;F506
【文献标志码】A
[DO1l10.13616]j.cnki.gcjsysj.2017.10.074
1引言
根据交通运输部2014年第28号文关于发布《内河航运建设工程概算预算编制规定》及配套定额的公告,对于内河水域及人海河流口门以上水域新建、扩建、改建的内河航运建设工程概算及施工图预算的编制,执行此规定。内河航运建设主要包括内河港口工程、内河航道整治工程、内河航道疏凌工程、航运枢纽工程、通航建筑物工程和其他航道附属设施工程以及内河修造船厂水工建筑工程。而对于人海河流以潮汐影响为主(潮流界以下)河段的上述工程,其单位工程建筑安装工程费用的计算可参照执行《沿海港口水工建筑工程定额》及
【作者简介】李中艳(1984~),女,湖北武汉人,工程师,从事工程造价研究。
万方数据
【文章编号】1007-9467(2017)10-0225-03 相应配套定额和施工取费标准。
由此可见,对于人海河流不以潮汐影响为主的工程,原来采用交通部交水发[2004]247号文发布的《沿海港口建设工程概算预算编制规定》及相关定额,现在则需执行《内河航运建设工程概算预算编制规定》(JTS116-1-2014)及相关定额。往往很多工程项目在工程可行性研究或初步设计的时候,执行的是沿海定额,而到设计优化、审查的时候却开始执行内河定额了,以往我们对于工程投资变化的分析主要是受设计方案和市场价格的影响,现在则需额外考虑定额调整对工程投资的影响。因此,进行《沿海港口建设工程概算预算编制规定》(简称《沿海编制规定》)及相关定额与(内河航运建设工程概算预算编制规定》(简称《内河编制规定》)及相关定额的差异分析是有必要的。
225