蒲石河抽水蓄能电站辅机管路安装技术
胡凯,王仲陆
(武警水电第二总队入支队,福建厦门361009)
【摘要]通过辽宁蒲石河抽水蓄能电站的水利机械附属设备管路的安装,介绍了前期管路预理和后期明管安装技术,包括管路施工工序、安装要求、施工工艺及各项规范要求。结果表明,通过严格控制安装施工工艺,确保了安装
工程质量和进度,安装优良率达到100%。【关调】水电站;管路;安装;施工工艺
【中图分类号】TU81;TM621.7
【文献标识码]人
【文章编号】1002-8498(2012)12-0012-03
InstallationTechnology of Auxiliaries Pipeline in Pushihe
PumpedStoragePowerStation
HuKai,Wang Zhonglu
(No. 8 Detachment, No. 2 Hydropower Force of Armed Police, Xiamen, Fujian 361009, China)
Abstract; Combined with installation of auxiliaries pipeline in Pushihe Pumped Storage Power Station in Liaoning province, the installation technology of pipeline pre-buried in earlier stage and exposed pipe in later stage are introduced including pipeline construction process, installation requirements, construction technology and codes requirements. The results show that the installation quality and time are ensured by
strict controlling installation process, and the good rate of pipeline installation is 100%. Key words:hydroelectric power stations; pipelines; installation; construction
蒲石河抽水器能电站位于辽宁省宽甸满族自
治县境内,是我国东北地区在建的第一座大型纯抽水蓄能电站.总装机容量为120万kW,单机容量为 30万kW。2011年底首台机组投产,担负起调峰填谷、调频调相、紧急事故备用的作用。水机管路在电站中的作用是保障水电站的水、油、气系统疏通运行,保证机电设备正常运转。管路安装主要有前期管路预埋和后期明管安装,都有系统性的安装规范、技术要求、注意事项和施工工艺,在施工中应运用得当,才能确保管路的安装质量,保证施工进度。管路安装施工工序
1
管路安装施工工序:技术准备→+材料准备→管路放线→管道支吊架制作安装→管道配制及附件安装→管道试压、吹洗、油漆→与设备进行调试。
2管路安装要求 2.1管路预埋要求
1)管路应按设计要求进行防腐。【收稿日期】2012-03-08
【基金项目]武警水电第二总队2012-—2014年度科研规划项目
【作者简介】朝凯,武督水电第二总从人支队助理工程师,福建省厦门市潮里区禾山镇尚忠社360号361009,电话:13470076909,E
mail:beker_1985@163,com 方方数据
2)管路的出口尺寸与设计尺寸偏差≤10mm,管口伸出混凝土面≥300mm,管口应可靠封堵,防止混凝土浇筑时堵塞管口。
3)管路采取焊接,不宜采用燃纹和法兰连接。 4)测压管路应尽可能减少拐弯,曲率半径符合
设计要求,并考虑排空。
5)排水、排油管路应有同流向一致的坡度。
6)对管内清洁度要求较高的管路宜采用不锈钢材料。
7)管路过混凝士伸缩缝时,其过缝保护措施应符合设计要求。
8)承受压力的管路应进行水压试验,确保焊接质量。
9)安装时要做好管路支撑加固工作,保证尧筑后管路位置不变。
总体上管路预埋的安装布置有局部的可调节性,这样调节变通就可以有效地解决各预埋管路“打架”、“撞车”等问题。以蒲石河电站为例,有些安装尺寸和位置有很准确的要求,比如技术供水管路、机组消防管路的安装等;有些安装位置的随意性较大,没有具体的安装、工艺性与美观性等要求,