电网接纳风电能力的制约因素分析及措施
赵昊鹏
(安庆供电公司,安徽安庆246000)
摘要:随着风电并网机组的快速增加,风电并网容量与电网接纳风电能力之间的矛盾日益突出,电网所能接纳的最大风电容量成为了风电资源利用的关键问题。通过分析制约电网接纳风电能力的各种因素,建立电网接纳风电能力的分析模型。针对各地区风电并网的具体情况,采取必要的可行的科学措施,最大限度提高电网接纳风电的能力。
关键词:风力发电;接纳能力;调峰能力;安庆电网
中图分类号:TM614
文献标志码:B
文章编号:1009-3230(2013)09004704
RestrictingFactorsandMeasuresofWindPower
IntegrationCapacityinPowerGrid
ZHAO Wu-peng
(Anqing Power Supply Company,Anhui 246000,China)
Abstract:With gradual increase penetration of wind power generation in power system, the principal contradictions between the wind power generation and the integration capacity become increasingly prominent, which become the key problem of wind power resource utilization. Analysis of the various factors restricting the integration capacity in power grid, and create the analysis model. According to the specific situation, taking the necessary measures, improving the integration capacity in power grid.
Key words:Wind power generation; Integration capacity; Ability of peak load regulation; Anqing powergrid
0引言
风能是非常重要并储量巨大的能源,它安全、清洁、充裕,由于风力发电过程不消耗矿产资源,不排放污染物和温室气体,因此,利用风力发电已成为风能利用的主要形式,发展速度日益加快。安徽省政府曾经于2011年4月出台《皖江示范区基础设施规划》推进当地风电产业发展,2013年1 月30日,安庆首座风力发电厂(安徽宿松华港风收稿日期:20130710修订日期:2013-0811 作者简介:赵吴酷(1984-),男,华北电力大学碳士研究生
现款职于安徽省安庆供电公司发履策划部,项目前期专责,工程师,负责220kV及110kV输变电工程项目前期的管理工作。
万方数据
47
电场)成功并网发电,一期装机容量为49.5MW,二期也在建设中。此外,岳西县牛草山风电场、机阳县三公山风电场、望江县陈岭风电场、怀宁县石镜风电场正处于项目前期阶段,太湖县徐桥风电场已结束设计阶段,并网线路将于今年9月开工建设。但是,由于风电具有随机性和间歇性等特点,风电大规模并网将会对电网系统产生诸多影响,而电网系统接纳风电的能力是有限的,研究电网接纳风电能力的制约因素,进而采取可行的必要措施,对于提高风电并网容量、确保电网的安全运行具有重要的理论和现实意义。