
2014年3月上第43卷第5期
DOI:10. 7672/sgjs2014050107
施工技术
CONSTRUCTION TECHNOLOGY
大体积混凝土施工最高温度简化计算方法改进
郑小鹰
(厦门经济特区房地产开发集团有限公司,福建厦门361004)
[摘要]通过软件计算和线性回归计算的数据处理,建立温升折减系数计算表格,使其能够适合各种不同板厚、混
凝土施工最高温度的简化计算方法,提高了计算精度。并结合工程实例介绍了该简化计算方法的应用。【关键词]混凝土;大体积混凝土;折减系数;简化计算;施工技术
[中图分类号]TU755
【文献标识码]A
[文章编号]1002-8498(2014)05-0107-04
ImprovementofSimplifiedCalculationMethodoftheMaximum
Temperature in Mass Concrete Construction
Zheng Xiaoying
(Xiamen Building Derelopment Group Co. , Lid. , Xiamen, Fujian 361004, China)
Abstract:By data treatment of software calculation and linearregression calculation,the author establishes calculation table of temperature rise reduction factor, which suits different plate thickness,
simplified calculation method of the maximum temperature in mass concrete construction for Technical specification for thermal cracking control of mass concrete of port and waterway engineering JTS202—1-2010, increases calculation precision. Finally, this paper introduces application of the simplified calculation method in engineering practice.
Key words : concrete;mass concrete; reduction factors; simplified calculation; construction
1建立适合不同条件细化的温升折减系数表格
最高温度是大体积混凝土施工温控设计的重
要指标,也是一些建设规程计算大体积混凝土内部最大温度应力的重要参数]。文献「11中最高温度的简化计算,因所做的假定对其他各种不同条件下最高温度简化计算带来的误差同题。笔者还以 2.5m厚基础板为例,分组计算了温升折减系数和最高温度,揭示了它们随混凝土入仓温度和气温差值、绝热温升和气温变化的规律。从中可以看出:文献1中简化计算方法对单一的板厚采用温升折减系数来计算所有条件的最高温度在一定范围内将带来较大误差,因此,从已揭示的规律根据不同条件细化温升折减系数将是提高最高温度简化计算方法计算精度的一个关键。
对温升折减系数的细化,拟依托笔者建立的最高温度和温升折减系数的分组计算程序来完成。
[作者简介]郑小鹰,高级工程师,E-mailzhengppeng@163.con[收稿日期]2013-06-13
107
但是,对各种常见的不同基础特定板厚,按该文献分组原则计算各种条件的温升折减系数,由于分组时每个板厚根据不同的混凝土人仓温度和气温的温差(t。-t。)划分为5个大组,每个大组又根据不同的混凝土最大绝热温升(T)划分为6个小组,每个小组分别计算8个不同气温(或不同混凝土人仓温度)条件下的温升折减系数,共需计算240个温升折减系数,使得设计的温升折减系数计算表格过于庞大复杂。
由笔者计算分析反映的规律为:在特定的混凝土人仓温度和气温差值及特定的最大绝热温升条件下,混凝土最高温度随气温呈线性变化,温升折减系数也随之呈近似的线性变化关系,进一步分析,温升折减系数和混凝土入仓温度呈更好的线性关系,利用这一规律,对每一个小组的数据通过线性回归分析计算建立温升折减系数和混凝土入仓温度的线性回归公式,大大简化了温升折减系数计算表格。回归分析利用Mathcad自带的“linea