2016年第3期
炼油与化工
REFINING AND CHEMICAL INDUSTRY
应用流程模拟技术优化乙烯装置运行
于家涛
(大庆石化公司化工一厂,黑龙江大庆163714)
摘要:利用ASPENPLUS流程模拟软件对某石化公司300kt/a乙烯装置脱甲烷塔进行建模后模报拟运
行,找出了该塔存在的瓶颈间题,并针对存在的间题进行优化分析,取得了较好的效果。关键词:脱甲烷塔;流程模拟;操作优化
中图分类号:TQ221.211
文献标识码:B
文章编号:16714962(2016)03005903
Usingprocesssimulationtechniquetooptimizeethyleneplantoperation
YuFiatao
(No.1 Chemical Plant of Daqing Petrochemical Company, Daqing 163714, China)
59
Abstract: ASPEN PLUS process simulation software was used to simulate operation after modeling of demethanizer in the 300 kt/a ethylene plant of a petrochemical company, bottleneck problem existed in this demethanizer was found out.
Optimization analysis was made to the problem existed, good result was obtained. Keywords: demethanizer; process simulation ; operation optimization
某石化公司300kt/a乙烯装置采用顺序分离流程,脱甲烷塔处于整个分离流程的中间环节,因此脱甲烷塔能否稳定高效运行直接关系到产品质量和整个分离系统稳定运行]。由于前冷系统膨胀制冷压机EC-401/402设计不合理,EC-4014 402无法正常运行,冷量供给不足.脱甲烷塔塔项乙烯损失增加。
1脱甲烷塔水力学核算
脱甲烷塔ET-405为填料塔,高度为52m,塔体由3段组成。塔底部直径3m,中部直径1.9m,项部直径1.6m。
脱甲烷塔分为5段,因此需逐段进行核算,第 1~5塔段的水力学核算结果依次见图1~5。
0.400f 0.37
0.3
分段性置
0 11 12 13 14 15
图1第1塔段的水力学核算
8.45 0.46
分段位置
20
2
图2脱甲烷塔第2塔段的水力学核算
0.7sh 0.co 0.65
上图学
0.6 0.50 0.45
25
2627 分段径置
28
图3第3塔段的水力学核算
29
22
由图5可以看出,除第3、第4股进料位置处液泛因子较高外,全塔负荷因子均较小,基本保