建筑软土地基沉降对燃气管道和其配套设施的
损害影响治理及实例分析福建省龙海市燃气管理站(363100)
)许物王
摘要通过建筑软土地基沉降对燃气管道和其配套设施的损害影响实例分析,提出治理方法及建筑桩基、燃气工
程系统设计建议,明确软土地基沉降影响观测方法,确保建筑和燃气设施安全。关键词建筑软土地基沉降燃气管道和其配套设施工程实例分析
SettlementofSoftGroundontheGasPipelineConstructionandits Damaging Effects of Treatment Facilities and CaseAnalysis
Gas Station in Longhai CityXu Wuwang
AbstractSettlement of soft ground by the construction of gas pipeline and its supporting facilities, the damaging ef-fects of a case study, proposed treatment methods and the construction of pile foundation, gas engineering system de-sign proposals, clear soft ground affected by the settlement methods of observation to ensure the safety of buildings and gas facilities.
Keywords ConstructionSoft soil settlement Gas pipeline and its supporting facilities Engineering case study
1引言
近年来,在管道燃气供气规划区内,新建、改建、扩建的住宅小区一般应同时配套建设管道燃气设施,并与建筑主体工程同时设计、同时施工、同时竣工验收。根据漳州市九龙江平原地质构造为高压缩性软土地基的基本特征,容易产生高层民用建筑地基沉降,造成住宅小区内及周边燃气管线和设施受损。因此,有必要根据当地地质情况,就软土地基沉降对燃气管道影响进行实例分析,总结软土地基桩基处理及燃气管道埋设处理的方法,做好同步设计
的衔接,确保施工与使用安全。 2工程实例
2.1工程概况
龙海市某学术交流中心,现被租赁经营大酒店。工程为框架结构,建筑总面积13238.25㎡,地上12 层,地下1层,共13层。地下室层高为4.7m,底屋至三层高为4.5m,四至十一层高为3.6m,十二层高为 4.5m,主体总高度为48.2m,建筑全长为52.5m,建筑宽度19.5m,基础采用静压预应力混凝土管桩基础。 2006年峻工投入使用,2009年元月工程主体安装市政燃管设施,同时由管道燃气经营企业安装燃气立管及相应设备后实现供气,气源为液化石油气,两级调压入户,中压管压力为0.4MPa,低压管压力 0.1MPa,燃气表和用户调压器分别集中安装于其中一个外墙的表箱。
2.2地基沉降及燃气管道损害情况
2009年5月,燃气经营企业接该大楼经营业主