
工程建设与设计
cas&BuFe
BIM技术在城市综含管廊建设中的应用探讨
Discussion on thePractical Application of BIMTechnologyin theConstruction
ofUrban.ComprehensiveCorridor
刘博涛
(中铁广州工程局集团有限公司,广州712000)
LIUBo-tao
(China RailwayGuangzhou Engineering Bureau of Co.Lid.,Guangzhou 72000,China)
【摘要】伴随着城市现代化建设进程加快,我国不断出台城市地下综合管廊建设相关政策,BIM技术作为1项新的信息技术,融入成市地下综合管廊建设中,助力解决其建设过程中的系列问题。论文结合实例探讨BIM技术在综合管廊建设中的应用以及存在的问题和解决思路,可供相关人参考。
[Abstract]With the process of accelerating the construction of urban modernization, BIM technology is a new information technology, which is introduced into the construction ofurban underground integrated corridor to help solve the series ofproblems in theprocessofonstruction.ThispapermainlydiscussestheapplicationofBIMtechnologyintheconstructionofintegratedcorridor,as
wellasthe problems encountered and the solutionideas forreferenee and adoption byrelevantpersorinel.【关键词】BIM技术;炼合管廊;三维仿真模拟;4D;解决思路
[Keywords ]BIMtechnology;integrated corridor, three-dimensionalsimulation; 4D;solutions
【中图分类号】TU990.3
【文献标志码】B
[DO1l10.13616/j.cnki.gcjsysj.2018.01.015
1引言
城市地下综合管廊是地下城市管道综合走廊,目前在我国建设中受到诸多因素制约。近年来,BIM技术的诞生给工程界带来了全新活力与转型升级,不断解决了工程领域系列问题,城市地下综合管廊建设也深受其益。但现阶段,将BIM技术融人城市地下综合管廊建设之中的项目并不多。鉴于此,笔者以自身所参与的城市地下综合管廊项目来探讨BIM技术在其建设中的应用。
【作者简介】刘博涛(1991~),男,陕西镇安人,工程师,从事BIM 技术与工程管理研究。
56 万方数据
【文章编号】1007-9467(2018)01-0056-04
2我国综合管廊建设中存在的主要问题及 BIM技术的融入
2.1当前国内综合管廊建设中存在的主要问题
我国城市地下综合管廊建设起步较晚,近些年,我国许多城市(上海、广州、武汉、西安)开始了综合管廊的建设,但在建设过程中存在诸多问题,影响着综合管廊在我国建设中的发展,究其原因主要有以下几点:
2.1.1建设规范和标准不完善及欠缺
从我国2015版《城市综合管廊工程技术规范》中可知,本规范对综合管廊之中的缆线管廊相关要求及规定涉足较少,对于盾构方式的圆形断面施工工法没有明确规定,因此,该版规范在施工工法上还存在欠缺。由于综合管廊建设规范与标