高速公路桥梁顶升施工控制初探
PrimaryExplorationonLiftingConstructionoftheHighwayBridge
陆彬,周斌
(潮南路桥建设集团公司,长沙410004)
LUBin,ZHOU Bin
(Hunan Road& Bridge Construction Group Corp,Changsha 410004,China)
【摘要】高速公路大修过程中,一般均采用加镜路面结构层的方象,路基一般加铺几层,有的加储厚度基至达到了30cm多,而析面一般只能加铺一层上面层,致使路基路面与桥渠桥面存在一定的高程差,所以桥果一般进行桥梁整体预升,以接顺路面,论文介细了桥架整体预升主要控制方法和控制的关键措施等,
[Abstrcat ]In thethoroughrepairation ofhighway,the overlayofpavementstructure willbeused usually. Theroadbed generallywillbeaddeda few layers, the thickness ofwhich sometimes reaches to thirty centimetres. Bridge tend only to overlay a layer above, resulting in a difference o elevatio between thepavement and bridge deck. Sothebridge should beoverallifted in orderto pick up along theroad. The article will discuss the
main controlmethod in the overalliftingconstructionofbridgeand itskeymeasures【关键词】高速公路;桥梁;整体顶升;施工控制
[Keywords Jhighway;bridge; theoverlifing;construction control
【中图分类号】U445.6 1引言
[文献标志码】A
湖南长益高速公路大修路面结构方案为:旧路面处治 +16cm连续配筋水泥混凝土补强层+2cmAC-10隔离调平层 +1cm应力吸收层+6cm中面层+4cm上面层,总厚度达到了 29cm。为满足路面平整度的要求,一般在桥渠前后路基200m 范围内进行调坡。而调坡段施工工程量比较大,工期比较长,投资也比较高。因此,在长益高速公路大修施工过程中进行了桥梁顶升的探索,全标段共17座主线桥,其中就有15座采用了桥梁顶升技术。
根据不同的桥梁结构形式和施工工艺,可以将顶升分为分段顶升和整体顶升两大类。分段顶升是把桥梁分若干段落(一般以跨为段),逐步对每段进行顶升,其施工过程不需要同
【作者简介】陆彬(1979~)男,湖南衡阳人,工程师,从事高速公路施工与管理研究.(电子信箱)5994535@qq.com。
124 万方数据
【文章编号】1007-9467(2013)10-0124-03
时装配大量机械设备,能有效节约成本,但施工工期比较长控制每段顶升质量的难度也比较高;整体顶升不需将桥梁分段,但必须投人大量的机械设备,整体将桥梁顶升,原结构作为一个整体构件,其顶升位后整体性比较好,但所投人的机械设备比较多。施工方案选择应根据桥架的结构形式、整体强度(刚度)、现场施工条件、经济比较等多种因素综合选定。长益高速公路桥梁多采用先简支后连续的空心板上部结构,都比较
短,所以比较适合整体顶升。 2桥梁顶升的准备 2.1顶升队伍
桥梁顶升是一项比较复杂、施工难度较大的工程,必须由专门从事桥架顶升的队伍来完成,在进行桥梁顶升前,要有成套的桥梁顶升设备、完善的桥梁顶升方案及详尽的安全控制措施。
2.2高程控制