地下厂房防渗排水方案的三维渗流仿真模拟设计
姚新刚,胡正凯
(中国电建集团华东勘测设计研究院有限公司,浙江杭州310014)
摘要:句容抽水蓄能电站地下厂房区存在岩溶水渗漏可能,暴雨期涌水量大.通过地下厂房涡群图岩渗流三维仿真模拟,分新了各方案渗控效果,图绕岩溶通道和降两补给两大特点,通过方案对比优选,充分考虑募滩蒙对于阻隔密石聚腺水和封闭岩溶通道的作用,确定采用全封闭灌浆惟募加全封闭排水孔作为地下厂房防渗排水措施. 关键词:句容抽水蓄能电站;地下厂房;三维渗流场;防渗惟最
中图分类号:TV731
文献标志码:A
文章编号:1008536X(2016)06-0041-05
SeepageControl and Drainage Designof Underground Powerhouse
Based on 3-D SeepageAnalogueSimulation
YAO Xin-gang, HU Zheng-kai
(Powerehina Huadong Engineering Co. Ltd. , Hangzhou 310014, China)
Abstract: The possibility of karst water leakage exists is underground powerhouse region of Jurong Pumped Storage Power Station, especially during the period of storm rainfall. Seepage control schemes were estimated by 3-D seepage analogue simulation of underground powerhouse complex, and different seepage control measures were compared, finally the scheme of close anti-seepage curtain wall and close drainage holes was adopted as the seepage control measures.
Key words: Jurong Pumped Storage Power Station; underground powerhouse; 3-D seepage field; anti-seepage curtain wall
地下水对于地下厂房洞室的不利影响主要体现为:围岩长期处于饱和状态,岩石物理力学参数降低,对洞室稳定不利;地下水的存在导致厂房处于潮湿状态,不利于电气设备长久可靠运行;当渗水量很大时,地下厂房面临局部滤没的风险.因此,对于地下厂房而言,防渗排水设计对于提高洞室稳定,改善设备运行条件,降低厂房淹没风险具有重要的意义,
句容地下厂房区位于地下水位以下,地下厂房区存在管道一溶孔-裂隙含水层,因此地下厂房存在岩溶水的渗漏可能),暴雨期涌水量较大.本文拟定了两套方案,并根据地下厂房润群围岩渗流三维仿真模拟成果,优选出句容地下厂房防渗排水方案
工程概况及水文地质条件
句容抽水蓄能电站位于江苏省句容市境内,枢收稿日期:2016-03-28
作者商介:姚新刚(1984-),男,江西新干人,高级工程师,研究
方向为地下厂房结构设计万方数据
纽工程主要建筑物由上水库、下水库、输水系统、地下厂房和开关站等组成.地下厂房位于仑山主峰北东侧山坡,地面高程为175~200m,上覆岩体厚约 140160m,地下厂房位于输水线路尾部,厂房上游侧距上水库约880m,引水竖井距厂房上游侧约 141m,竖井高程为26~104m,主变洞下游侧距下水库约250m.围岩以Ⅲ类为主,断层破碎带、岩脉蚀变带、溶蚀裂隙处为IVV类.地下厂房主润室包括主副厂房洞、主变洞,主副厂房洞开挖尺寸为 246.5m×25.8m×57.2m(长×宽x×高)主变洞开挖尺寸为242.5m×18m×(22.15~28.85)m(长×宽×高),两大洞室平行布置,净距为40m
地下厂房、主变洞位于地下水位以下,厂房区岩体透水率以小于3Lu为主,透水性小,属弱~微透水性,平洞揭露的断层F3oV2V4V穿过厂房,外围断层发育,如JVis、Fs、F等,断层带均具溶蚀现象,红色粘土充填,暴雨季节J,断层带涌水量达 300L/min;其周边的断层带内涌水量达600~ 700L/min,位于厂房的下游约40~50m断层涌