四棱台状防汛堵口多面体混凝土预制块设计
陈丹,魏月梅”
(1.南京市水利规划设计院股份有限公司,江苏南京2100062.江苏苏盛工程造价咨询有限公司,江苏南京210029)
摘要:多面体混凝土预制块其有体积大、重量重、易于预制、取材方便、生态环保、抗冲能力强、能快速对堵决口等优点,近年来在防汛堵口抢险工程中逐步得到应用.基于此,结合城市内河河流特征,对一种四校台状多面体混凝土预制块进行了构件形状设计、水流冲击力计算、抗冲击力计算和稳定系数计算并给出了应用于决口对堵工程实际的自重分别约为.0t和.61的四棱台状多面体混凝土预制块的2个构建方案及其造价,可供河湖提防决口封堵抢险工程参考
关键词:河湖堤防;决口;堵口;混凝土预制块;四校台
中图分类号:TV842
文献标志码:A
文章编号:1008536X(2017)06-0029-04
DesignofPoledral PrefabriatedConcret eBdksinQudangula rFrustum
Pyand forFloodPrevention and LeveeBreachClosue
CHEN Dan, WEI Yue- mei
4. Nanjing Water Panning and Designing Institute Co - , Lid. ,Nanjing 210098 ,China ; 2 - Jiangsu Susheng Engineering Cost Consultation Co -, Ltd., Nanjing210029, China )
Ab trct : Polyhedral prefabricated concrete blocks are a kind of new technology for the flood prevention and levee breach closure with good characteristic of bulk mass , heavy weight easy precasting convenient material drawing ece friendly protection ,strong anti -scouring and fast levee breach closure , In recent years , polyhedral prefabricated concrete blocks are used for flood prevention and levee breach closure step by step with good application effect . Therefore , on the base of the intensive study on the characteristics of city inland rives , the paper carries out the shape design , the calculation for the im-pact of the current against the shore , the calculation for the impact resistance and the calculation for the stability coefficient for the polyhedral prefabricated concrete blocks in quadrangular frustum pyramid . Two construction plans and two kinds of construction cost have been put forward for the polyhedral prefabricated concrete blocks in quadrangular frustum pyramid with the weight of 1 ton and 2 ton. The study results of the paper can provide some references for the flood prevention and levee breach closure.
Kg w rdsdike project of rivers and lakes ; breached dike levee breach closure :prefabricated concrete block ; quadran -gular frustum pyramid
抗御洪水的能力所造成的口门过流现象称为堤防
研究背景
汛期洪水和风暴潮的侵袭能力超过河湖堤防收稿日期:2017-01-13
作者简介:陈丹4983-),女,江苏靖江人工程师,主要从事水利工程设计及研究工作
万方数据
决口.堤防发生决口水毁的过程中选择适当时机对口门进行封堵称为堵口,一直以来河湖堤防决口封堵抢险中多采用直接抛石和铅丝笼、竹笼装石或大体积沙袋抛堵等传统方式但这些堵口抢险材料需要外部调运、现场装填,施工强度大、作业难度高,而且由于单体重量小、无法岸上联结成整体,致