2014年第4期
煤、焦监控技术与备煤料线控制系统的优化
王永树谭绍栋杨名红
(焦化厂))
摘要:结合柳钢焦化厂各生产线工序独立配套性不强给备煤物流与质量管理带来的不使,分析了备煤监控技术与料线运行现状,介绍了优化措施与效果。
关键词:焦化;备煤;炼焦;监控技术
Optimization for Coal and CokeMonitoring Technology and
Stock-levelControlSystemofCoalPreparation
WANG Yongshu TAN Shaodong YANG Minghong
(Coking Plant,
Abstract: By combining with the inconveniences caused by inadequate process procedure of each pro-duction line for coal preparation distribution and quality management in Coking Plant of Liuzhou Steel, the coal preparation monitoring technology and stocklevel operation situation were analyzed, and the optimized countermeasures and its effects were also introduce.
Key Words: Coking; Coal Preparation; Cokemaking; Monitoring Technology
1前言
焦化厂焦炭年产能500万吨,现有(2× 42+33)孔(三焦)和2×60孔JN43-80型(四焦)焦炉2组、2×55孔(一、五焦)、2× 60孔(二焦)JN60-6型焦炉3组。由于历史和用地原因,5条生产线平面工艺布置复杂,且工序间独立性极差,其中备煤系统料线交错、煤场互相依赖性极强:严重影响卸煤、贮煤、上煤生产。此外,从煤种入厂到配煤炼焦过程中,缺乏有效的在线监控技术,大量监控工作完全依靠人工和工人责任心,因此煤种错混、配煤断流、设备操作事故、焦炭质量波动等时有发生。本厂于2011年投资350万元,历时2 年对备煤料线系统进行了优化改造,同时对煤、焦质量监控系统进行提升。本文进行总结。
王永树:大学学历,高级工程师,现主要从事技术管理工作。
2现状分析
(1)生产线工序配套能力不足,独立性不强。2001年以来,焦化厂连续多年进行扩能改造:2001年在原三炼焦2×42孔炉组旁扩建33 孔JM43-80型焦炉;2004年新建四炼焦;2005 年新建一炼焦:2008、2010年因用地紧张,在三炼焦系统配套的三煤场新建了二、五炼焦,至此二、三、五炼焦系统(390方吨年产能)没有配套的煤场,3条生产线失去了相应的独立性。加上煤场卸、贮能力不足,使焦炉用煤成为生产瓶颈。同时,因来煤品种结构不合理、数量不均匀等需汽运转煤,造成厂内物流费用每月高达数十万元,无疑增加了运营成本。
(2)经过历年改造,全厂形成了一个共有大小皮带近70条、19块切煤翻板构成的复杂网络型料线系统。且料线控制集中度低,生产调度困难,料线开停操作复杂,易发生产事故。