2011年1月第40卷
第1期
施工技术
CONSTRUCTION TECHNOLOGY
跨山谷架空管道机械牵引施工技术
张静,事碧军
(成都建筑工程集团总公司,四川成都610031)
【搞要】基于赤天化纸业污水处理厂工程特点,机械吊装设备难以进人施工现场。在跨山谷架空管道施工过程中,采用逐榻依次推进卷扬机板立技术,成功地解决了管道立柱的安装间题。通过设置固定焊接操作平台和卷扬机高空桥式水平牵引延伸相结合的技术,避免了焊工高空作业的安全隐惠,加快了施工进度,保证了管道焊接质量,节约了施工成本。
【关键调】管道工程;跨山谷施工技术
【中图分类号】TU741.1
【文献标识码]A
[文章编号】1002-8498(2011)01-0073-04
Construction Technology of OverheadPipelineMachine
Traction across Valley Zhang Jing, Gu Bijun
(Chengdu Construction Engineering Group Co. , Chengdu, Sichuan610031,China)
Abstract:Taking Chitianhua paper sewage plant as example, it is difficult for hoisting machine to enter the construction site. During the construction of overhead pipeline across valley, the erecting technology is adopted step by step to solve the installation problems of pipeline column. The safety hidden danger at high altitude is prevented by selecting fixed welding platform with horizontal pulling of hosting at high altitude. Thus, the construction period is shortened to ensure the quality of pipeline welding, which can save construction cost.
Key words: pipeline engineering; across valley; construction technology
1工程概况
贵州赤天化纸业污水处理厂外排水管从厂区排出口至水河边,管道为Φ820×9螺旋卷管,总长 450m,沿途需穿越公路、跨越山谷,顺陡坡(约60°)而下。跨山谷处,谷底与管道底部高差20多m,最大一个山谷跨度132m。架空部分管架共8座,支架间距13.8m,其中2根为独立钢柱,均为人字钢立
柱,立柱之间采用Φ325×8钢管连接成整体。 2施工难点
由于该工程所在地植被茂密、无现成施工道路,大型吊装设备无法直接进人施工区域;每个管道人字支撑立柱柱脚底部标高均不相同;其中最高立柱高20.33m,质量达5t:大量管道焊口位于管架高空,
施工难度大,危险性大。【收稿日期】2010-11-10
【作奢介】张静,成都建筑工程集团总公司总工程师,教授级高级工程师,成都市八宝街111号610031,电话:(028)86124627,E
mail;673100917@ qq. eom 万方数据
3技术方案比选
3.1满堂脚手架搭设
73
在架空管道沿线进行满堂脚手架的搭设,使其成为辅助吊具及运输通道,利用脚手架设置吊点进
行管道支撑的安装和管道敷设。 3.2
汽车式起重机安装
修建临时施工便道,使40t汽车式起重机能够到达吊装区域,对架空管道支撑及管道本体采用汽车式起重机配合安装。
3.3机械牵引结合人工微调技术
通过建立卷扬机吊装模型,对管道支撑立柱采用逐榻依次推进法进行扳立吊装,同时对管道安装采取设置固定焊接操作平台和卷扬机高空桥式水平
牵引延伸相结合的技术。 3.4比选结果
1)施工资源要求
满堂脚手架搭设需要大量
脚手架,由于现场交通运输困难,脚手架的转运需要大量人工,同时脚手架搭设对地面的要求也比较高,需对地面进行处理。汽车式起重机需要修建专用临