天津金融街(和平)中心一汇金中心塔冠施工技术
高元任,王龙,张强
(中建一局集团建设发展有限公司,北京100102)
[摘要]鉴于本工程的特点和施工难雄点,钢稳杆采用“钢绞线承重,液压干斤项集群作业、计算机同步控制”安装施工技术。重点介绍了提升平台设置,下吊点设置,拼装平台设置,液压同步系统控制,钢梳杆拼接、焊接、提升、卸载
等施工工艺。钢枪杆在提升过程中,实时监测提升点的钢梁挠度,提升完成后监测钢榄杆垂直度。【关键词]钢结构:钢枪杆:液压提升:卸载:检测;施工技术
[中图分类号】TU758.11
【文献标识码]A
[文章编号】1002-8498(2016)20-0049-04
TianjinJinrongjie(Peace)Center-HuijinCenterTowerCrown
ConstructionTechnology
GaoYuanshi,WangLong.ZhangQiang
( China Construction First Diarision Group Construction & Derelopment Co.,Lid. , Bejing100102, China)
Abstract:In view of the characteristics of the project and construction difficulties, steel mast applies‘steel wire bearing, hydraulic jack cluster operation, computer synchronous control installation and construction technology.Thelifting platform setting,the setting of thelower lifting points,theassembling platform setting, the hydraulic synchronization system control, and the steel mast joining, welding, lifting,unloading and other construction techniques are mainly introduced.In the process of the steel mast ascension, steel beam deflection in the lifting point is real-time monitored, and the steel mast verticality is monitored after the completion of lifting.
Key words : steel structures; steel mast; hydraulic pressure promotion; unloading; testing; construction 1工程概况
天津金融街(和平)中心一汇金中心塔冠坐落于结构主塔楼上,由塔冠和塔尖2部分组成。塔冠分9层,标高为185.500~217.950m,杆长 54.9m.标高为208.050~262.950m。塔冠构件数量约1000件,最大截面尺寸为口450×300×20;钢枪杆为圆管柱,截面尺寸为Φ1000×30。塔冠属于中空钢桁架体系,塔冠随高度增加逐渐内收,塔冠底部在标高185.500m和194.500m位置处与结构主
塔楼连接,榄杆属于细长杆件,2道法兰盘将塔冠和榄杆连为一体,组成塔冠体系。塔冠三维示意如图 1所示。
2施工方案确定
1)钢杆提升段长54.9m,总重约60t,根据现场已有的9号塔式起重机,有效提升高度为240m,杆分段安装不能完全满足施工需求。
[作者简介】高元仕,工程师,E-mail:gyuanshi@163.con【收稿日期]月厉数据
图1塔冠三维示意
Fig.13D sketch of the tower
49
2)根据现场施工情况,若增加塔式起重机标准节高度来提高塔式起重机提升有效高度,可解决该问题,但必须搭设满堂脚手架,那么满堂脚手架的高度将达到45m,施工安全将无法保证。
针对上述问题,采用“钢绞线承重,液压千斤顶集群作业、计算机同步控制”能很好地解决此类