Startup operational tests of fast reactors
WANG Zhou
C1., Thermal Engineering Department of Tsinghua University, Beijing 100084, China:
2. China Institute of Atomic Energy, Beijing 102413, China)
Abstract; This paper is mainly concerned with the experiences of the two main phases of startup operational tests of fast reactors (1)The general tests and Sodium filling before core loading. (2) The core loading, approach to criticality and power build up opera-tional tests, taking for example a large and middle demonstrating integrated-type fast reactor
Key words;fast reactor; startup operation; fuel loading; approach to criticality; rising of poweroperation
20世纪90年代,世界上最大的试范快堆“超风凰"(3000MWth),一个能从天然铀中提取比压水堆高60倍潜能的堆型,初期患了些“大堆幼年病”(泄漏),后来出现的缺点终于得到了解决,发电量越来越多,开始有了收益,却长期停止了运行。
18年过去了,快堆尚未商业化。然而面对严重的温室效应,石油及铀资源的短缺,及解决
别无选择的世纪能源间题,俄国、法国、英国和美日发达国家又恢复了快堆的计划,准备建设技术更成熟、安全、经济效益好的第四代快中子反应堆。中国在赶上时代堆型的征程上,努力缩短差距,也选择了快堆的池式钠冷试验堆型,走出了第一步。
池型快堆的启堆试验包括如下三个阶段(图1):