2015年12月上第44卷第23期
D01:10.7672/sgjs2015230091
施工技术
CONSTRUCTIONTECHNOLOGY
新型超高层核心筒顶模系统结构安装技术
何旭,向旭智,陈龙章,石非,唐
浩
(中建钢构有限公司,广东深圳518040)
【摘要】项模系统因其施工效率高、操作安全、顶升智能化等优点,在越来越多的超高层建筑核心简施工中被广泛应用。顶模系统由动力控制系统、挂架系统、模板系统、支撑系统、桁架平台系统5部分组成。从顶模系统的动力及支撑结构安装、桁架平台结构安装、挂架结构安装的方法施工技术措施等方面,提出若干施工建议,以便指导顶模结构的安装施工。
【关键词】高层建筑;顶模系统;核心筒简;安装
【中图分类号】TU758;TU974
【文献标识码】A
【文章编号】1002-8498(2015)23-0091-03
InstallationTechnologyoftheNewFormworkJackingSystemforthe
CoreTube of Super TallBuilding
He Xu,Xiang Xuzhi,Chen Longzhang,Shi Fei,Tang Hao
(China Construction Steel Structure Co. ,Lad. ,Shenzhen,Guangdong 518040,China)
Abstract: The formwork jacking system is widely used in the core tube construction of super tall buildings because of some advantages including high construction efficiency, operational safety and intelligent jacking system and so on. This kind of formwork jacking system consists of dynamic control system, hanging rack system,formwork system,support system,truss system.This paper puts forward some construction suggestions from installation technology aspects of above mentioned-systems in order to guide installation construction of formwork jacking structure.
Key words: tall buildings ;formwork jacking system ;core tube; installation
工程概况 1
龙光世纪项目位于广西南宁市青秀区东盟商务区中柬路与中菲路交汇处,是一幢以酒店、办公为主的综合性大型超高层建筑物。整体结构为地下5层,地上为塔楼和裙楼。塔楼层数为81层,主体结构高度为377m,建筑高度为383m。
新型顶模系统由动力控制系统、挂架系统、模板系统、支撑系统、桁架平台系统5部分组成。动力系统通常采用长行程大吨位液压油缸,控制系统采用计算机进行全信息化自动化控制:支撑系统通常由格构柱及上、下箱梁组成;桁架平台由主桁架、次桁架、连接件组成,桁架采用贝雷架拼装而成,主桁架相交处连接支撑立柱:整个平台下面吊挂定型模板及挂架。挂架系统及桁架平台的荷载通过支撑格构柱作用于附着在核心简剪力墙预埋件上的上、
【作者简介】何旭,助理工程师,E-mail:834487972@qq.com
[收稿日期】2015-01-13 万方数据
下箱梁上。顶模系统结构如图1所示。
KXKXXXXKXKXXX 鲜菜菜菜
台
捷架系统
外挂架
内推菜上箱架下箱等
棋板系统动力系统
图1顶模系统结构示意
支撑系统
Fig.1 The structure of formwork jacking system 2顶模结构安装
91
顶模系统结构安装顺序遵循荷载传递规律,安