挖孔桩混凝土异常硬化原因分析研究
翔”,宋开伟”
石从黎”,杨
(1.重庆市建统籽学研究院,至庆400015;2.主庆建工集团,重庆
401122)
[摘要】针对重庆某1.程挖孔链混及土异常碳化间题,采用物理试验.化学分析、X衔射分析和热分析等手段对异常硬化混酸七的物理性质.化学成分和矿物成分进行分析,结果表明;挖孔桩内混数土含水事极高,强度低,但有明显的水泥水化产物存在:混土异常硬化的主要原国是挖孔桩内有渗水或积水造成混土严重离析分层,水化
产物不能填满空隙,固体颗粒搭接少,导致混酸土殖松。【关键调】挖孔桩;混凝土;异常读化;含水车
【中图分类号】TU753.3
【文献标识码】A
【文章编号】1002-8498(2011)07-0044-03
AnalysisonReasonsofAbnormalHardeningofConcreteinBoredPile
Shi Congli',Yang Xiang',SongKaiwei
(1. Chongqing Research Institute of Building Science, Chongqing 400015, China; 2. Chonging Construction Engineering Groap Co. , Lad. , Chongqing 401122,China)
Abstract: According to the problem about abnormal hardening of bored pile concrete in a project in Chongqing, the authors analyze physical properties, chemical composition and mineral composition of abnormal hardening conerete by physical examination, chemical analysis, X-ray diffraction and thermal analysis. The results show that bored pile concrete has high water content, low strength and obvious cement hydration products, The reason on abnormal hardening of concrete is that because of serious segregation of concrete caused by seepage and water accumulation in bored pile, cement hydration produets can't fill void.
Key words:bored pile; concrete; abnormal hardening; water content 工程概况
重庆某商业住宅工程,2009年10月进行了1
号楼66根挖孔桩的浇注,该批挖孔桩的桩身长度在 4~10m,采用商品混凝土泵送浇注,设计混凝土强度等级为C30,落度控制要求为200mm。
混凝士
浇注过程中施工单位和混凝土供应单位均对混凝土的质量无异议。但是.在挖孔桩浇注14d后,施工单位发现其中9根挖孔桩凝结异常,出现了不凝结、异常硬化的现象,如图1所示。
为探明原因,在现场异常硬化桩上部异常硬化的胶凝材料层分别取了具有代表性的异常硬化胶凝物质(见图2),其中,A样取自与空气接触的外部,B 样和C样取自胶凝材料层内部松软物质。松软程度依次为C样>B样>A样。此外,还现场钻取同【收稿日期】2010-08-08
【作者第介】石从察,重庆市建筑科学研究院混发上工程研究所工程军,重疾市徐中区人和街31号
400015,电话:(023)63621533,E
mail; shicongli01@ 126, com 万方数据
注:桩芯已被别除
异常硬化挖孔桩内部情况
图1 Fig.1
Internal condition of abnormal hardening bored pile
批次浇注的正常硬化桩基混凝土。
2
试验方法
2.1
pH值测定
异常硬化样品的pH值测试采用取出固液萃取
法(ex-situleaching)测定碱度。具体步骤为:将选择的试样破碎,充分研磨,过筛(用0.08mm方孔筛),称取10g准备好的粉体试样,加人10倍质量的蒸馈水中,用橡皮塞塞紧以防碳化,每隔约5min振动