察汗乌苏水电站泄洪洞混凝土
衬砌裂缝化学灌浆处理
潘翔,戎雷
(武警水电第二总队,江西南昌330029)
【摘要】结合察开乌苏水电站泄洪润混凝土涉漏水情况,采用“内填外填、多层设防,复合防水"多重措施相结合的修补方案。对于宽度超过0.1mm,深度大于5em的裂缝,果用LW和HW型水溶性案氢酯化学源禁材料进行充填
处理。详细介绍了灌案处理施工流程和施工工艺。经两次灌浆处理后,大部分裂缝治理效果明显。【关键词】水电站:混凝土;量洪酮:村翻:裂缝:化学灌浆
【中图分类号】TV732
【文献标识码】A
[【文章编号】1002-8498(2012)08-0093-02
Chemical Grouting for Concrete Lining Cracks Treatment of
SpillwayTunnelinChahanwusuHydropowerStation
Pan Xiang,Rong Lei
(No. 2 Hlydrepower Fore of Armed Police, Nanchang, Jiangxi 330029, China)
Abstract : Multiple complicated reinforcement measures are adopted in concrete lining eracks treatment for spillway tunnel in Chahamwusu Hydropower Station including filling in cracks and blocking out of the cracks, multiple protecting and complicated waterproofing. The LW and HW chemical grouting materials of water soluble polyurethane are adopled to filling the cracks when they over O. 1mm in width and 5cm in depth. The construction process and technology are introduced. After twice grouting, evidence treatment effect is gained.
Key words:hydropower stations; concrete; spillway tunnels; linings; cracks; chemical grouting
1工程概况
新疆察汗乌苏水电站泄洪润于2007年11月份开始试运行,经运行初期发现的主要病害为混凝土渗漏水。2008年年底与2009年3月17日关闸后,经业主、监理、设计与施工四方两次入洞检查(水位高程约为1635m,泄洪洞进水口高程1574.2m),发现洞内存在以下问题:①上游面混凝土顶板渗漏较严重:②侧墙施工缝渗水:③有一部分混凝土表面有渗水。
2设计方案
混凝土顶板和侧墙裂缝堵漏采用“内填外堵、多层设防、复合防水”多重措施相结合的修补方案。
1)所有外露混凝土建筑物裂缝,缝宽<0.1mm
时不做处理,当经宽≥0.1mm、整深>5cm时采用化学灌聚法处理,缝深<5cm的裂缝采用充填法处理:
【收瑞日期】2011-11-10
期,武警水电第二总队工程师,江西省南昌市高新
【作者离介】语区艾溪朝三路
330029,电话:15807910911,E-mail; 672184704 @
99-com
万方数据
出现渗水的层间缝采用化学灌浆法处理。
93
2)裂缝处理的化灌浆材料采用LW型水溶性聚氨酯和HW型水溶性聚氨酯混和浆液。充填法的裂缝处理材料采用弹性环氧砂浆。
材料特性 3
LW/HW是一种快速高效的防渗堵漏补强加固化学灌浆材料,已在工程中得到广泛应用。该成果曾荣获国家科技进步奖。其特点如下。
1)有良好的亲水性能,水既是稀释剂,又是周化剂。浆液遇水后先分散乳化,进而凝胶固结。
2)可在潮湿或涌水情况下进行灌浆,对水质适应性强,在海水和pH值为3~13的水中均能固化。
3)固结体经急性毒性试验属实际无毒类。 4)施工工艺简便,浆液无需繁杂工艺配制。
5)HW具有较好的力学性能,使用于混凝土或基础的防水堵漏、补强加固处理。
6)LW与HW水溶性聚氨酯化学灌浆材料固结体是一种弹性体,具有较好的力学性能,而且遇水会膨胀,具有弹性止水和以水止水的双重功能。LW