包管钢筋混凝土水下非连续浇筑施工技术
周江,崔立志
贵合肥230023)
(中铁四局集团市政工程分公司,安徽
【摘要】结合沉管施工,设计了一种水下安装、拆除的模板体系,保证了水下钢筋混凝土的结构尺寸;通过试验配制了一种高性能的水下不离散混凝土,并结合混凝土拌合物的性能特点,制定了合理的水下混凝土非连续浇筑施工
工艺,保证了在有一定水流速条件及非连续浇筑的工况下,水下混凝土的浇筑质量。【关键词】混凝土;包管钢筋混凝土;水下浇筑;模板;施工技术
【中图分类号]TU755.6*8
【文献标识码】A
【文章编号】1002-8498(2017)03-0045-03
The Discontinuous Pouring Technology of Reinforced Concrete of
Packaging Pipe Underwater
Zhou Jiang, Cui Lizhi
(The Municipal Engineering Co. , Ld. of CTCE Group, Hefei, Anhai 230023, China)
Abstract: With sinking construction, an underwater installation, dismantling formwork system was designed, which ensured the underwater structure size of reinforced concrete. By test, a high performance underwater indiscrete concrete was prepared and combined with the characteristics of concrete mixture, reasonable discontinuous pouring construction underwater was put forward.This technology ensured the concrete pouring quality underwater in the condition of certain water flow velocity and discontinuous pouring.
Keywords:concrete; formwork;construction
1
工程概况
reinforced
concrete
南京市某污水提升泵站进出水管道改造工程,有一段管道需穿越内秦准河,设计为双Φ1800mm 钢管,单根长60m。由于管顶距河床仅0.3m,设计在管外包裹钢筋混凝土以配重抗浮。如图1所示。
原设计采用围堰排水后,开槽施工,由于管道离下游排涝泵站仅15m左右,不具备围堰施工条件,经研究决定采用沉管法施工管道,水下浇筑包管钢筋混凝土,因此需要解决模板、钢筋水下安装
及混凝土水下浇筑等技术难题。 2水下安装、拆除模板体系
根据现场施工条件及工程特点,研制了一种附着于沉管的模板加固支架,随沉管下沉到位后,水下吊装模板。
2.1模板支架及模板制作要点
1)模板支架采用型钢制作,横杆采用L75×5
周江,副总工程师,高级工程师,E-mail:gyjb126.com
[作者简介】周
【收日期】2016-02-01;[修订日期】2016-07-20 万方数据
of
packaging Ott
2
pipe;
pouring
underwater;
45
焊牢300厚C30混凝土,后期清除
至14@200/3.500
14@200/
绿12g4q0400oom 20400400层800元
重14@2802001.5000
EE
C30钢筋混凝土包封 200厚C15碎石垫层 400厚块石,实
图1包管铜筋混凝土断面
Fig.1 Profile of packaging pipe reinforcement concrete 制作,与钢管焊接:立杆采用[80×5制作,类似于闸门溜槽,以利于模板水下安装。
2)模板支架在陆上按设计位置与钢管焊接牢固,沉管施工时,与钢管一起下沉到位。模板支架如图2所示。
3)模板采用高强复合竹胶模板(规格为