焊接现场
机械制造文摘一焊接分册
百方干瓦核电站主蒸汽超级管道横向
限制件焊接缺陷分析
刘金贵,薛源,杨春娥,王为辉
(中广核工程有限公司设备采购与成套中心,广东深圳518124)
摘要:某百万千瓦压水堆核电项目主蒸汽超级管道横向限制件角焊缝在役前检查期间发现多处裂纹,经打磨消缺及补焊处理后满足了设计要求。从主要从焊接材料、工艺、热处理等方面分析缺陷产生的原因,并对后续项目同类产品避免出现同样问题提出了经验反馈。
关键词:核电站;主蒸汽;超级管道;裂纹中图分类号:TG444
Reason analyze of cracks on main steam superping
lateral restraint welding area of 1 000
MWnuclearpowerplant
Liu Jingui, Xue Yuan, Yang Chune, Wang Weihui
(China Nuclear Power Engineering Company Lid., Equipment Procurement & Supply
Division, Shenzhen 518124, Guangdong, China)
Abstract: Many cracks were found on the main steam superpiping lateral restraint welding area during 1000MW nuclear power plant pre service inspection. These Weld defects were removed by grinding and welding repair to aeaeeaa process, post welding heat treatment etc. to draws out the reason, and made experience feedback to other pro jects to avoid the same problems
Key words:nuclear power plant; main steam; superpiping; crack.
0前言
目前国内运行的1000MW级CPR1000核电机组主蒸汽管道上布置有超级管道或类似结构的管道部件。主蒸汽超级管道是指反应堆安全壳外从主蒸汽管道的安全壳机械贯穿件起至主蒸汽管道横向限制件下游第一道焊缝止的一段饱和蒸汽管道。超级管道热工参数高、焊缝多、受力复杂,尤其在事故工况下所受冲
362016年第2期
万方数据
击力大,具有较高的安全性,要求较高。
超级管道简介 1
每条主蒸汽环路共布置4段超级管道,分别为T1, T2,T3,T4段,主蒸汽超级管道结构示意图如图1所示。除了作为主蒸汽管道的一部分以外,其超级管道上还安装有主蒸汽安全阀、主蒸汽隔离闵、射线检验插塞、保温挂环等重要安全相关阀门装置,其中一段超级