高层建筑地下连续墙的施工技术
High-riseBuildingUndergroundContinuousWallConstructionTechnology
田军
(北京双诚建设监理公司,北京100037)
TIANJun
(Beung Shuang Cheng Construction Project Supervision Co., Beijing 100037,China)
工程施工技术
【摘要]地下速续墙具有较大的刚度,可以很好地承受侧向压力,并在基坑开挖过程中出现较小的变形,由于施工中声较小,对周边的建筑物电不会产生太大的形响,能够在建筑物比较密集的地方使用,可以有效地保护城市环境论文结合实例,对高层建筑地下连续墙的施工技术进行了探讨。
[Abstract JUnderground continuous wall with great rigidity, can be very good under lateral pressure, and in the excavation process in small deformation, due to the construction of small noise, on the surrounding buildings will not have much impact, in the building compared with intensiveplacetouse,can effectivelyprotectthecity environment. Basedonthis,thisarticleunifiesthe exampletohigh-risebuildingundergroun
continuous wall construction technology is discussed.【关键词】高层建筑;地下连续墙;施工技术
[Keywords Jtallbuilding,underground continuous wall;construction technology
【中图分类号】TU94;TU974 1实例概况
【文献标志码】]
某高层建筑楼,楼高28层,并设置了两层地下室。负2层底板面的标高达到了-8.900m,在开挖地下室的基坑结构时深度达到了-9.700m。在基坑支护的建造过程中将地下连续层和内支撑结合起来。围护结构的地下连续墙厚度为800mm。并且地下连续墙的境底嵌人岩超出了3000mm。压顶架截面面积确定为1200mm×800mm,支撑截面的面积确定为800mm× 800mm。内支撑的中间设置了若干个中800mm的立柱。施工
中采用的混凝土强度等级确定为C25混凝土。 2施工技术
2.1测量放线工作
【作者筒介】田军(1975~),男,山东济宁人,工程师,从事建筑工程
技术研究,(电子信霜)543800337@qq.com。万方数据
[文章编号】1007-9467(2013)05-0161-03
测量放线在施工中是一道非常重要的工序。在该工程中
主要选择了全站仪1台套以及S3水准仪一套来完成测量放线工作。进人现场之后,首先需要复核测量基准点、线以及水准点,并将复核结果提交到监理单位进行确认。其次,根据原
来的基准点以及水准点来建立相应的项目施工控制网。 2.2导墙制作
在进行地下连续墙施工的过程中一个重要的施工环节就是导向墙,它主要是沿着地下连续墙的中心线制作而建成的临时构筑物。(1)具体制作流程。进行导向墙的测量定位工作,在选定位置上展开士方的开挖工作,完成清基和排水工作,进行测量的放线以及定位工作,钢筋的制作和安装,完成翼混凝土和墙体混疑土的瓷注,加内撑并进行土方的回填工作。(2)对回填土进行分层夯实。在完成导墙的拆模工作之后,为了避免发生导墙位移的情况,需要在导墙内侧上、下部位每间隔两米的距离设置80mmx80mm的木防进行有效支撑。(3)施工中