邯宝炼铁厂2#高炉
冷却壁维护与生产实践
席立朋
(河钢集团邯钢公司邯宝公司炼铁厂,河北邯郸056015)
Total No. 256 2017,Number4
摘要:对邯宝炼铁厂2#高炉冷却壁的破损情况及生产维护进行了分析。采取加强原燃料日常管理、确定合理的操作制度、优化上下部调剂等措施后,2#高炉实现了稳定顺行。在修补损坏冷却壁的同时,开
孔安装铜质微型冷却棒后,改善了冷却壁的冷却效果,有效控制了冷却壁的损坏问题。关键词:高炉;冷却壁;维护:实践
中图分类号:TF321.4
文献标识码:B
doi: 10. 13630/j. cnki. 13 1172. 2017. 0410
文章编号:10065008(2017)04003604
COOLINGSTAVEMAINTENANCE
ANDPRODUCTIONPRACTICEOFNO.2 BLASTFURNACEINHANBAOIRONWORKS
Xi Lipeng
( Ironworks, Hanbao Company, HBIS Group H nsteel Company, Handan,Hebei 056015)
Abstract: The damage situation and production maintenance of cooling stave in No. 2 blast furnace of Hanbao ironworks are analyzed. The No. 2 blast furnace achieves smooth and stable operation by strengthening the daily management of the raw and fuel materials, determining the reasonable operating system and optimizing the regulation of top and low part of furance. The installation of micro copper cooling rods improves the cool
ing effect and effectively control the damage of cooling wall. Key Words : blast furnace; cooling stave; maintenance; practice
引言
邯宝公司炼铁厂2#高炉(3200m)由中冶南
方设计院设计,是国内比较先进的铜冷却壁(5~8 段均为铜质冷却壁)薄炉衬结构的大型高炉,冷却壁共有14段,冷却方式为软水串联密闭循环结构,其中炉腹(5段)至炉腰(6段)均采用喷涂造衬技术,炉身下部7段、8段是镶砖铜冷却壁。该高炉于 2009年4月21日点火开炉今,已经连续生产了8年多,处于炉役中后期。近年来,道于成本压力,高炉入炉原燃料质量逐年变差、设备老化等问题日益突出。高炉操作难度加大,冷却壁损坏逐年增多,尤其是高炉第5段(共有192块)冷却壁,已有50块发生
收稿日期;2017-02-04
作者简介:席立朋(1978),男,助理工程师,2003年毕业于西安建筑科技大学冶金工程专业,现在河钢集团邯钢公司邯宝炼铁厂从事高炉生产研究工作,E-mail;xilipeng201612@126.com
36
万方数据
了不同程度的烧坏,损坏程度接近25%。为此,高炉车间通过长期摸索,大胆尝试,果断采取一系列措施之后,高炉煤气流分布趋于合理、炉况更加稳定顺行。目前,2高炉冷却设备损坏程度已得到有效控制,各项生产技术指标获得了明显改善。
冷却壁破损原因
1
2#高炉冷却壁损坏主要集中在炉腹(5、6段),分析认为损坏原因有如下几种。
(1)人炉原燃料不稳定
邯宝公司新区2台烧结基本上40天左右检修1 次,检修期间高炉要配吃50%落地烧结矿,原料成分不稳定,碱度、品位、粒度等波动较大;自产干焦产能低、性能不稳定,高炉被迫大量使用外购焦炭、配比变动频繁。为降低生产成本,高炉长期加大生矿(澳矿)配吃量。为减少粉尘污染料场长期给澳矿大量喷水,澳矿本来含有粉末就多,打水后成糊泥状