断层走向掘进巷道支护问题研究
张超
(山西省长治经坊煤业有限公司,山西长治047100)
2015年5月
摘要:结合经坊煤业3号媒层开采实际情况详细介绍了煤矿断层走向掘进巷道的支护条件及施工工艺,并对取得的成
果和效益进行分析介绍,对今后大断面煤巷综据有着现实指导意义,值得在同行业内进一步推广。关键词:断层;抵进;支护;效益
中图分类号:TD353
文献标识码:A
文章编号:2095-0802-(2015)05-0118-02
ResearchonSupportIssuesinFaultStrikeExcavationRoadway
ZHANGChao
(Changzhi Jingfang Coal Industry Co., Ltd. of Shanxi, Changzhi 047100, Shanxi, China)
Abstract: Based on actual mining situation of the 3' coal seam in Jingfang Coal Industry Co., Lad., introduces support conditions and construction technology of fault strike excavation roadway in the coal mines, and analyzes the achieved outcomes and benefits, which has practical significance for fully mechanized excavation in large section roadway and worth further promotion in the same profession
Key words: fault; excavation; support; benefits
0引言
煤矿井下掘进巷道施工经过断层区域时,由于地应力作用较大、围岩相对较松软,在进行掘进施工时很难一次成巷,在风化后的顶板岩层进行支护很容易失去稳定性进而引发冒顶事故。针对断层走向掘进巷道支护困难和施工危险等间题,目前煤炭行业已进行了大量研究和实践并取得了一定成果,但针对特殊情况,传统施工方法还具有一定的弊端,存在一些问题需要解决。本文将结合经坊煤业3号煤层开采实际情况对煤矿断层走向掘进巷道支护的关键技术进行分析,对于类似工程条件下的大断面煤巷锚杆支护综掘
快速掘进有着现实的指导意义!。 1工程概况
经坊煤业3号煤层断层、裂隙、节理、裙曲等地质构造发育,受地质构造影响,掘进工作面施工进度较慢。因此,3号煤层能否安全、快速地掘进决定着该矿的采掘衔接是否顺利。实现掘进工作面的安全、
快速掘进已成为该矿亟待解决的工程难题。收稿日期:2015-01-26
作者简介:张超,1989年生,男,山西霍州人,2012年毕业
于大原理工大学采矿工程专业,助理工程师。·118·
六采区掘进探巷发现,3号煤层顶板岩层结构复杂,主要由砂质泥岩、炭质泥岩及粉砂岩组成,局部含煤线;直接顶板为砂质泥岩、泥岩,局部为粉砂岩,厚0.86m~19.24m,厚度稳定性差,岩相变化大,结构松软,吸水易软化,强度较低;老顶为细粒砂岩或粗砂岩,厚2.55m~16.50m,岩相变化大。直接底板为砂质泥岩、泥岩,局部为粉砂岩,厚0.30
m~8.47m,岩相变化大。支护条件及施工工艺
2
2.1锚杆支护方案
经过前期对各种支护方式方法优缺点的对比,本工程最终决定采用联合支护方式,即金属网+锚杆+锚索+钢筋的支护方式。
2.2锚杆支护参数 2.2.1顶板支护
a)锚杆形式及规格。(a)所果用杆体为Φ22mm高强左旋螺纹钢筋,其长度为2200mm,杆尾螺纹 M24,型号为Φ22-M24-2400;(b)锚杆锚固方式。树脂加长锚固,采用2支锚固剂,一支规格为K2335,另一支规格为Z2360,钻孔直径为28mm,错固长度为 1.3m;(c)顶错杆预紧力300N·m;顶锚杆锚固力150 kN;(d)钢筋托梁规格。采用Φ16mm的钢筋焊接而成,宽度90mm,长度3800mm;(e)托板。采用拱型