泽43-12x井垮塌段双封双承托完井管柱设计与应用
王秀影1.2胡书宝’张勇”蒋本强+沈家训?邱爱民
1.中国石油大学(华东);2.华北油田公司工程技术研究院;3.华北油田公司开发事业部;4.游海铝探工程有限公司工程技术研究院
弓用格式:王秀影,胡书宝,张勇,蒋本强,流家训,邱爱民,泽43-12x并跨端段双对双承托完并管程设计与应用J」-石油钻采工艺,2017,39(6):702-706.
摘要:泽43-12x井为泽43潜山一口重点开发并,奥陶系日的层裂缝孔润发育,揭开潜山面时,发生失返性漏失,遗而乎致盖层泥岩段井壁跨塌,井下形成桥塞,提前下技术套管利用砂桥对第三系3810.77m以上地层承压图并,但3810.77~3853.61 m泥岩段未对固,存在后期接逻滑山储层的风险。通过分新三开完并的技术难点,提出双时双承托完井管程设计路,开展了配套工艺和工具等方面的研究,完成了尾管悬挂器优选、各工具压力级别及地层封隔系娩设计,研制开发了屑承托与地层封隔一体化工具,实现了多套不同内径、不同岩性地层的有效对隔,并且承托工具弹策钢精密钢带式设计可以满足不规则并壁封隔需求,实现自动调节。泽43-12x并的成功应用表明,该技术可实现复杂并段一趋管柱非固井封隔,为同类井的复杂并段对隔提供了借鉴。
关键词:潜山油藏;井壁跨塌;漏失;非固井封隔;岩屑承托与地层封隔一体化;完井管柱
中图分类号:TE257
文献标识码:B
Design of double-packer and double-retainer completion string and its application in the
collapsesectionof WellZe43-12x
WANG Xiuying, HU Shubao", ZHANG Yong, JIANG Benqiang, SHEN Jiaxun',QIU Aimin
1. China University of Petrolem (Easr China), Qingdao 266580, Shandong, China;
2. Engineering Technology Research Insritarte, PefroChina Harabei Oijfield Company, Rengiu 062552, Hebei, China
3.Development Department, PefroChtina Harabei Oijfield Company, Rengiu 062552, Hebei, China
4. Engineering Technology Research Instiarfe, CNPC Bohai Drilling Engineering Company Limited, Rengiu 062552, Hebei, Chind
Citation: WANG Xiuying, HU Shubao, ZHANG Yong, JIANG Benqiang, SHEN Jiaxun, QIU Aimin. Design of double-packer and double-retainer completion string and its application in the collapse section of Well Ze 43-12x [J] . Oil Drilling & Production Technology, 2017, 39(6): 702-706.
Abstraet: Well Ze 43-12x is a key development well in Ze 43 buried hill, and its target layer of Ordovician is characterized by de veloped fractures and pores, so total circulation loss happens when the surface of the buried hill is drilled. And consequently, the borehole in the mudstone section of cap rocks is collapsed and bridge plug is formed in the downhole. To deal with this situation, the technical casing is run in advance to carry out pressure cementing in the Tertiary strata above 3 810.77 m by using the sand bridge. However, the mudstonc section of 3 810.77~3 853.61 m is not cemented, so it is fiaced with the risk that buried-hill reservoir is buried in the late stage In this paper, the technical difficulties of the third spud completion were analyzed, and accordingly the design idea of double-packer and double-retainer completion string was proposed. Then, the support technologies and tools were researched. As a result, the liner hanger was selected, the pressure level of each tool and formation sealing system were designed, the integrated tool of cuttings retainer and for-
基金项目:华北油田公司中长期科技项目“华北油钻完并技术集成优化研究与实戏"(编号:2016-HB-Z01)。
第一作者:王秀影(1971-),2006年毕业于西南石沟大季,主要从事钻完并技术研究,高级工程师。通试地址:(062552)河北省任丘市华
北油田公司工程技术研究院。E-mail;cyy_wxy@petrochina.com.cn