130t/h中温中压煤粉锅炉供热方案研究
郭凤波
(赤峰热电厂,内蒙赤峰024000)
摘要:按国家产业政策,130Vh中温、中压煤粉锅炉即将于2016年关停,为实现130Vh 中温、中压煤粉锅炉继续为供热所用,设计了两种供热方案,并进行了技术经济比较,满足了日益扩张的城市采暖及工业供汽热负荷的要求。
关键词:煤粉锅炉:供热
中图分类号:TK2292
文献标志码:B文章编号:1009-3230(2016)02-0001-03
Studyon13Ot/hMediumTemperatureandMediumPressure
Pulverized Coal Boiler Heating
GUO Feng -bo
(ChifengThermalPowerPlant,Chifeng024000,InnerMongolia,China)
Abstract: According to the national industrial policy, 130 /h medium temperature, medium pressure pulverized coal boiler will be shut down in 2016, for 130 Vh medium temperature, medium pressure pulverized coal boiler continue to heat supply. The two heating methods is designed, and the technical and economic comparison is carried out, meet the expanding of urban heating and industrial supply steam heat load requirements.
Key words: Pulverized coal boiler nozzle; Heat supply
0引言
某电厂一期供热扩建工程建设3台130Vh 中温、中压煤粉锅炉,配置两台12MW背压式汽轮机排汽压力0.98MPa,排汽温度300℃,额定背压进汽流量178.8Vh,高背压220h,设计年供热能力为600万吉焦,按国家产业政策已列入上大压小关停机组计划,所接带的采暖热负荷将全部被转移。
因此,进行技术改造势在必行。 1
技术方案比选
(1)方案1:对现有3台130h中温、中压煤收稿日期:2015-1228
修订日期:20160129
作者简介:郭风波(1963-),副总工程师,工作单位:赤峰热
电厂,专业为热控。
万方数据
15
粉锅炉实施机组局部技术改造和环境影响评价,新建热网供水系统及热网首站,改造后达到新建机组技术要求和环境影响评价要求,达到立项审批验收条件。
(2)方案2:新建2×160MW调峰锅炉,新建热网供水系统及热网首站,实现供热初、末期实现一侧高温网供热、一侧低温网供热:供热高峰期实现1号机组凝汽器低温网供热,2号机组凝汽器高温网供热,供热温度不能满足要求时分别投人热网加热器运行,调峰锅炉作为供热高峰期及1、
2机组故障时所需热源。 2方案的可行性
方案1:新建3×130h中温中压煤粉锅炉,