第32卷
增刊1 12月
2012年
核科学与工程
Nuclear Science and Engineering
Vol. 32Suppl. 1
Dec.
核电厂厂用电供电方式改进分析
杨智慧,张涛
(苏州热工研究院有限公司电站瑞行技术研究中心,广东深圳518124)
2012
摘要:通过对比大亚湾核电站、田湾核电站、台山核电站6kV厂用电的系统结构、用电现状,分析机组在启动、功率运行、停运、主电网电源失去、机组保护动作时厂用电系统的运行方式,指出3种设计的优
缺点,提出了一些改进意见,供设计、工程、运营和改造部门参考。关键调:厂用电切换;备用电源;同期切换
中图分类号:TM623
文献标志码:B
文章编号:0258-0918(2012)S1-0024-07
StudyonImprovementforServicePower
SupplyforaNuclearPowerPlant
YANG Zhi-hui,ZHANG Tao
(Operation Technology Research Center, Suzhou Nuclear Power Research Institute,
Shenzhen of Guangdong Prov. 518124, China)
Abstract: This paper compares the 6 kV station power system type and situation of Daya Bay nuclear power plant, Tianwan nuclear power plant, Taishan nuclear power plant, it analysis the unit run mode at start, power operation, decommissioning, lost mains power supply, auxiliary power system run mode at the protection triggered, it not only pointed out the advantages and disadvantages of the three designs, but also made some of the improvements,for the design, engineering, operations and renovation sector reference.
Key words: station power transfer; back-up power;synchronizing transfer
厂用电主要为电厂的重要系统提供动力、控制和监视电源。由于绝大多数电厂负荷都是由其直接或间接驱动,厂用电的正常运行是电厂安全环境和电力生产持续的保障。全厂断电主要是指6.6/10kV厂用电源丧失。如果发
收稿日期:2012-08-20;修回日期:2012-10-25
生全厂断电事故,对于常规电厂意味着人身和设备等重大经济损失,面对于核电广还有可能导致核泄漏以及由此衍生的一系列重大的环境、社会影响。越来越多的研究表明,全厂断电事故是可能引发核电厂堆芯损坏的主要事故之
作者筒介:杨智慧(1971一),男,山西大同人,高级工程师,学士,毕业于东北大学自动控制系工业电气自动化专业,电力继电保护、
高压试验研究方向 24