NuclearPowerOperation 核电运营
核电厂运行准备与实践
吴雪松,卢铁忠
(海南核电有限公司,海南昌江572700)
摘要:核电厂的运行准备,是核电厂生产准备中的重要工作,由于核电厂从开工到投产的建设工期较长,一般需要5年左右,且核电运行的专业性要求很强,对核安全的要求也极高。特别是日本福岛事故后,国家层面、监管部门和各大核电集团都对核电厂的安全运行提出了更高要求。依据核电机组建设阶段的特点及结合工程实践,文章阐述了核电厂运行领城的体系建立,并概括性分析了相关管理创新。
关键词:核电厂,运行准备,人员配置:职责,培训;管理创新
中图分类号:TM623文献标志码:A文章编号:1674-1617(2015)01-0070-05
Preparation and Practice forNuclearPowerPlant
Operation
WUXue-songLUTie-zhong
(Hainan Nuclear Power Co.,Ltd.,Changjiang of Hainan Prov.572700,China) Abstract: The operational preparation of the nuclear power plant is an important work in nuclear power plant production preparation. Due to the construction period of
to production is as long as five years.
nuclearpowerplantfromstartingconstruction
theprofessional requirements
fornuclea
accident,highe bycompetent power groups.
powerplantand
system established in the field of nuclear the related management innovation.
am
strict. and the
Fukushima
iallyafterthe
eDoser
achnuclea
nuclear oundsthe
operation and generally
yanalyses
Key words:nuclear power plant,operational preparation;staffing,dutiestraining: management innovation
CLC number:TM623 Article character:A Article ID:1674-1617(2015)01-007005
核电厂运行准备主要包括人员准备、文件准备和物资准备以及工程参与等任务,本文以海南昌江核电工程的运行准备实践为基础,对核电厂运行领域的相关工作进行论述。
运行人员准备
运行人员准备是所有准备工作的重中之重,只有培养出一支技术过硬、作风优良的高素质、专业化的运行人员,才能保持核电机组安全稳定
收稿日期:2014-11-26
作者简介;吴雪松(1974—),男,江苏准安人,高级工程师,从事核电厂运行管理工作。 70