管桩大面积断桩事故的综合检测对策
基础工程设计
Eyinering Designafale Groun
Countermeasures for LotsBroken Piles Incidentof TubePileComprehensiveTesting
张迎
(天津市地质工程勘察院,天津300191)
ZHANG Ying
(Tianjin Geo-Engineering Investgation Institute,Tianjin 300191,China)
【摘要】以天津滨海新区某综合办公楼在基抗开挖时造成的预应力管链大面积断事故为例,针对管桩和桩周土均受到很大程度影响的情况,对补强处理后管椎可能存在的薄弱环节来用高、低应变,单雄水平试验等多种检测方法对事敏植的完整性和承载力进行综合检测,验证了对缺陷补强性采取多种检测方法综合判定其处理效果的有效性和泌要性。
[Abstract]Takeing lots broken pile accident in foundation excavation ofa integrated office located at Tianjin Binhai ncw area as an example, eded ad paaouar sa ea e uepoaaeeaar s pue ieosao pe comprehensively detectives the integrity and bearing capacity of accident pile using high strain dynamic testing and low strain dymamic testing singlepilehorizontalstaticloadtestandothermethods,andit wasshowing that thetreatmentiseffectiveand necessaryforpilesbroken incident【关键词调】预应力管械;断植;低应变;高应变;单桩水平试验
[Keywords ]prestressed pipepile;brokenpile;low straindynamictesting;high strain dysamic testing; horizontal static loadtest
【中图分类号】TU473.1
【文献标志码】A
[DOI]10.13616/j.cnki-gcjsysj.2017.03.112 1工程概况
该综合办公楼工程总建筑面积约30000m,采用PHCAB 500100型高强预应力管桩,设计单柱抗压承载力为1200kN。基坑深度大部为5m,局部1.5m。基坑开挖范围内均为黏土和淤泥质黏土,土层中含有机质,具有高压缩性、高灵敏度等特点,工程力学性质较差。
本工程的基坑采取了灌注桩+水泥搅拌柱挡土、止水方式。开挖过程采用单斗反铲挖掘机,一次挖至设计标高,在基坑开挖了约1/3后,工程桩出现了大面积柱位偏移、柱顶倾斜现象,经低应变法检测,已开挖部分除电梯井和靠近基坑支护边缘的少数管桩,绝大多数管桩在4~8m深度处都出现了相当严重的断裂,同时伴随着严重的柱位偏移、柱顶倾斜等缺陷。 2事故原因及处理措施
2.1管桩大面积断桩原因分析
根据现场资料,在基坑开挖前已完成了对工程桩试桩的【作者简介】张迎(1985~),男,山东庆云人,工程师,从事岩土工程检测技术与管理研究。
万方数据
【文章编号】1007-9467(2017)03-0027-02
抗压静载试验和低应变法检测工作,承载力和完整性情况良好,并且基坑较浅处(开挖1.5m)和电梯井部位(比基坑底部深 2m)的工程桩完整性情况较好,没有缺陷桩出现,由此判断此
次大面积断桩事故是基坑开挖过程中造成的。主要事故诱因有如下4项:
1)基坑内淤泥质土土方开挖程序未严格按照施工方案分层、分段开挖:
2)施工机械的运行挤压扰动土体;
3)预应力管桩水平抗力较差(根据经验,天津软土地区预应力管桩通常在柱顶偏移量达到40~55mm左右就会在桩身中上部发生断裂);
4)沉桩作业时积聚的挤压力和土层中孔隙水压朝开挖方
向释放,进一步加剧了淤泥向开挖方向的流动。 2.2事故处理措施
事故发生后,基坑开挖工作暂时中断,经过会商确定了事故柱处理的总体原则:(1)承载力能满足设计要求;(2)消除管桩倾斜的不良作用。
对于事故桩,首先采用水平顶拉的方法使管桩恢复原位
27