综放工作面过褶曲构造防倒架预防及处理办法
马智慧
(阳泉煤业集团二矿,山西阳泉045000)
2017年6月
摘要:以阳煤二矿80912综采工作面为例,说明造成例架的因素,并提出保持支架稳定的预防措施,以期预防社绝发生例架事故。
关键词:综采工作面;倒架因素;预防措施
中图分类号:TD355
文献标识码:A
文章编号:20950802(2017)06016302
Prevention and Treatment Measures for the Support's Fall during Passing through the Structure
of Fold at theFully-mechanized CavingFace
MAZhihui
(2"Coal Mine,Yangquan Coal Industry Group,Yangquan 045000,Shanxi,China)
Abstract: Taking the 80912 fullymechanized working face in 2' Coal Mine of Yangquan Coal Industry Group as an example, this paper demonstrated the factors causing support fall, and put forward the preventive measures for ensuring the stability of support, hoping to prevent this kind of accident.
Key words: fully mechanized working face; factors of support fall; preventive measures
0引言
阳煤二矿80912综采工作面,随着工作面不断推进,在进风推进至530m,回风推进至529m,35架~ 55架出现局部倒架现象,事故比较急,虽然采取了相应的处理措施,但是由于没有充分准备,预防不到位,致使工作面倒架现象严重,工作面处于停产超过 1d,大大制约了工作面的安全回采。为此,笔者经过现场实际勘察、认真研究与分析,总结出倒架事故的原因,同时采取了相应措施,最快速度进行工作面支架扶正,确保工作面能够继续安全、正常推进。
阳煤二矿80912综采工作面概况 1
阳煤二矿80912综采工作面地表位于龙门村以北-带,地形沟谷纵横。地面标高+911m~+1095m;位于十一采区,工作面东部为十一采区准备巷,西部为矿界保护煤柱,北部为尚未掘进的81101工作面,南部为尚未掘进的81103工作面;工作面标高+356m~+456 m,埋藏深度466m~677m;工作面走向长1761m;所采煤层为15*煤,属于复杂结构煤层,煤层厚度6.5 m~7.1m,平均6.8m;直接顶为泥岩和砂质泥岩,总厚度为8.1m,老顶为细粒砂岩,厚度为2.8m,灰黑色,分选性差,上粗下细,夹煤屑;采用走向长壁后退式综合机械化放顶煤回采方式,顶板管理采用全部跨落法处理采空区,工作面总体形态为背向斜相间发育,其上发育次一级褶曲构造。距切巷1280m~1330 m内错巷揭露紧密褶曲,两翼煤层倾角19°~25°,工作
收稿日期:2017-02-17
作者简介:马智慧,1988年生,男,山西山明人,2012年业于山东科技大学泰山科技学院采矿工程专业,助理工程师。
面无冲刷。
倒架因素说明 2
a)地质条件是发生倒架的客观主要因素,80912综放工作面现进风推进至530m,回风推进至529m,工作面回风巷高,进风巷低,两巷高差24m,受构造影响,工作面从4*~50架之间煤层倾角6°~47°,工作溜 10°~20°架坡度为20°、21*~30架坡度为22°、31~40° 架坡度为24°,高差大、角度大,构造区域推进速度慢; b)在整个开采过程中,输送机直线、顶底板破碎松软、超高支护、控制采高、是否规范操作、工人的经验是否丰富、管理者方案制定是否合理、作业是否合理等人为和设备因素是发生倒架的诱发因素(-2),倒架现场见图1。
价 n
o
图1倒架现场图
3预防措施
3.1保证支护强度
工作面从1架往后采取仰斜开采工艺,根据现场实际情况,120架适当掩煤、20*~50*架割底,进风巷正在通过高冒区,1架与高冒区的顶板接顶后,把1*~ 50架坡度顺直,工作面坡度控制在15°以下;合理控制
·163·