Q/GDW 1860-2012
1000kV架空输电线路铁塔组立施工工艺导则
Construction technology guide to the assembly and erection of the steel pipe towers of 1000kVoverhead double transmission line
2014-05-01实施
2014-05-01发布
目次
前言………………………………………………………………………………………………………………………………………1
1范围 …………………………………………………………………………………………………………………………………3
2规范性引用文件………….…………………………………………………………………………………………………………3
3 基本规定….………………………………………………………………………………………………………………………………3
4施工准备………………………………………………………………………………………………………………………………………3
5 内悬浮外拉线抱杆分解组塔 ……………………………………………………………………………………………………………4
6内悬浮内拉线抱杆分解组塔 ……………………………………………………………………………………………………………..10
7内悬浮内拉线双摇臂抱杆分解组塔 ……………………………………………………………………………………………………..13
8 座地内(外)拉线双摇臂抱杆分解组塔 …………………………………………………………………………………………….19
9座地双平臂抱杆分解组塔 ……………………………………………………………………………………………………………. 25
10 座地四摇臂抱杆分解组塔 …………………………………………………………………………………………………………………30
11塔式起重机分解组塔 ……………………………………………………………………………………………………………………..33
12流动式起重机分解组塔……………………………………………………………………………………………………………….39
13 质量要求 ……………………………………………………………………………………………………………………………………41
14安全措施 ……………………………………………………………………………………………………………………….41
附录A(资料性附录)常用抱杆主要参数……………………………………………………………………………………………….43
附录B(资料性附录)内悬浮外拉线抱杆组塔受力分析计算 …………………………………………………………………….45
附录C(资料性附录) 内悬浮内拉线抱杆组塔受力分析计算 …………………………………………………………….48
附录 D(资料性附录) 内悬浮内拉线双摇臂抱杆组塔受力分析计算 ……………………………………………. 51
前 言
本标准是依据国家电网公司《关于下达 2012年度国家电网公司技术标准制修订计划的通知》(国家电网科(2012)66号)文件的要求修订编写。
本标准是在总结我国架空输电线路铁塔(包括角钢塔、钢管塔)组立施工技术和施工经验基础上,结合特高压双回路输变电工程钢管塔施工工艺的研究成果,并参考 500kV、750kV、±800kV 及 1000kV 架空输电线路施工技术标准及有关现行国家、行业标准编制的。
本标准主要内容包括∶范围、规范性引用文件、基本规定、施工准备、组塔方式及工艺、质量要求、安全措施及附录等。其中组塔方式包括内悬浮外拉线抱杆分解组塔、内悬浮内拉线抱杆分解组塔、内悬浮内拉线双摇臂抱杆分能解组塔、座地内(外)拉线双摇臂抱杆分解组塔、座地双平臂抱杆分解组搭、塔式起重机分解组塔、流动式起重机分解组塔。
本标准由国家电网公司基建部提出并负责解释。