DB/T 29-126-2025
备案号:J10522-2025
天津市民用建筑节能工程施工
质量验收规程
Specification for acceptance of energy efficient
building construction of civil building in Tianjin
天津市工程建设标准
2025-01-21发布
2025-04-01实施
天津市住房和城乡建设委员会
发布
天津市工程建设标准
天津市民用建筑节能工程施工
质量验收规程
Specification for acceptance of energy efficient
building construction of civil building in Tianjin
DB/T29-126-2025
J10522-2025
主编单位:天津市建设工程安全质量监督总站
天津建质建设工程检测试验有限公司
批准部门:天津市住房和城乡建设委员会
实施日期:2025 年 04 月 01 日
2025
天
津
天津市住房和城乡建设委员会文件
津住建设函[2025]13 号
市住房城乡建设委关于发布
《天津市民用建筑节能工程施工质量
验收规程》的通知
各有关单位:
根据《市住房城乡建设委关于下达 2023 年度天津市工程建设
地方标准编制计划的通知》(津住建设函[2023]158 号)要求,天
津市建设工程安全质量监督总站、天津建质建设工程检测试验有限
公司等单位编制完成了《天津市民用建筑节能工程施工质量验收规
程》,经市住房城乡建设委组织专家评审通过,现批准为天津市工
程建设地方标准,编号为 DB/T 29-126-2025,自 2025 年 4 月 1 日
起实施。
各相关单位在实施过程中如有意见和建议,请及时反馈给天津
市建设工程安全质量监督总站和天津建质建设工程检测试验有限
公司。
本规程由天津市住房和城乡建设委员会负责管理,天津市建设
工程安全质量监督总站、天津建质建设工程检测试验有限公司负责
具体技术内容的解释。
天津市住房和城乡建设委员会
2025 年 1 月 21 日
前
言
根据天津市住房和城乡建设委员会《关于下达 2023 年度天津
市工程建设地方标准编制计划的通知》(津住建设函[2023]158 号)
要求,本规程是在编制组广泛调研,认真总结实践经验,结合本市
建设工程实际情况,参考国家和本市相关标准,并在广泛征求意见
的基础上编制而成。
本规程的主要技术内容是:1.总则;2.术语;3.基本规定;4.
墙体节能工程;5.幕墙节能工程;6.门窗节能工程;7.屋面节能工
程;8.地面节能工程;9.供暖节能工程;10.通风与空调节能工程;
11.空调与供暖系统冷热源及管网节能工程;12.配电与照明节能工
程;13.监测与控制节能工程;14.地源热泵换热系统节能工程;15.
太阳能热水系统节能工程;16.太阳能光伏节能工程;17.建筑节能
工程现场检验;18.建筑节能分部工程质量验收。
本规程在执行过程中如有意见和建议,请寄天津市建设工程安
全质量监督总站(地址:天津市河西区郁江道与内江路交口陈塘庄
街安融大厦 1 号楼,邮编:300222)。
本规程主编单位: 天津市建设工程安全质量监督总站
天津建质建设工程检测试验有限公司
本规程参编单位: 天津市建工工程总承包有限公司
天津华惠安信建设工程有限公司
天津市建筑工程质量检测中心有限公司
天津市贰拾壹站检测技术有限公司
天津建科建筑节能环境检测有限公司
天津市建筑设计研究院有限公司
天津津贝尔建筑工程试验检测技术有限公司
天津市建材业协会
天津市既有建筑修缮技术服务中心
天津市神奇装饰工程有限公司
天津泽瑞建筑工程咨询有限公司
本规程主要起草人员: 王书生
穆凤麟
冯
凯
张雨宁
经
纬
刘宝昌
路
芳
杨忠亮
王俊茹
刘
静
梁雪松
马安龙
王戊己
张泽美
潘锦超
陈小奕
鞠培荣
罗振慧
徐
杰
房
跃
宋
健
刘用广
白
玉
刘光文
商秀金
张明轩
陈祥雨
窦学有
黄盼飞
方昕彧
殷
峰
胡
毅
张宇崧
张
晨
王
梓
陈
岳
刘
柳
本规程主要审查人员: 张文龄
虞晓童
刘
杰
胡振杰
张津奕
王丽雯
余
流
李胜英
张春福
杜水利
目
次
1
总则··································································································1
2
术语··································································································2
3
基本规定··························································································5
3.1
技术与管理·······························································································5
3.2
材料与设备·······························································································5
3.3
施工与控制·······························································································7
3.4
验收的划分·······························································································8
4
墙体节能工程················································································10
4.1
一般规定·································································································10
4.2
保温板材·································································································13
Ⅰ
主控项目····························································································13
Ⅱ
一般项目····························································································16
4.3
预制复合墙板·························································································17
Ⅰ
主控项目····························································································17
Ⅱ
一般项目····························································································21
4.4
其他节能材料·························································································22
Ⅰ
主控项目····························································································22
Ⅱ
一般项目····························································································25
5
幕墙节能工程················································································27
5.1
一般规定·································································································27
5.2
主控项目·································································································29
5.3
一般项目·································································································32
6
门窗节能工程················································································34
6.1
一般规定·································································································34
6.2
主控项目·································································································35
6.3
一般项目·································································································37
7
屋面节能工程················································································39
7.1
一般规定·································································································39
7.2
主控项目·································································································40
7.3
一般项目·································································································42
8
楼地面节能工程············································································44
8.1
一般规定·································································································44
8.2
主控项目·································································································45
8.3
一般项目·································································································46
9
供暖节能工程················································································48
9.1
一般规定·································································································48
9.2
主控项目·································································································48
9.3
一般项目·································································································54
10
通风与空调节能工程··································································55
10.1
一般规定·······························································································55
10.2
主控项目·······························································································55
10.3
一般项目·······························································································63
11
空调与供暖系统冷热源及管网节能工程································· 64
11.1
一般规定······························································································· 64
11.2
主控项目······························································································· 64
11.3
一般项目······························································································· 68
12
配电与照明节能工程··································································70
12.1
一般规定·······························································································70
12.2
主控项目·······························································································71
12.3
一般项目·······························································································73
13
监测与控制节能工程··································································75
13.1
一般规定·······························································································75
13.2
主控项目·······························································································76
13.3
一般项目·······························································································81
14
地源热泵换热系统节能工程······················································83
14.1
一般规定·······························································································83
14.2
主控项目·······························································································83
14.3
一般项目·······························································································86
15
太阳能热水系统节能工程··························································88
15.1
一般规定·······························································································88
15.2
主控项目·············································································88
15.3
一般项目·······························································································91
16
太阳能光伏节能工程··································································93
16.1
一般规定·······························································································93
16.2
主控项目·······························································································93
16.3
一般项目·······························································································96
17
建筑节能工程现场检验······························································97
17.1
围护结构现场实体检验·······································································97
17.2
设备系统节能性能检验·····································································100
18
建筑节能分部工程质量验收····················································102
附录 A
建筑节能工程用主要材料的见证取样····························105
附录 B
围护结构节能工程开工条件验收表································111
附录 C
保温板材与基层的拉伸粘结强度现场拉拔检验方法····112
附录 D
保温板粘结面积比剥离检验方法····································114
附录 E
保温浆料干密度、导热系数、抗压强度检验方法········116
附录 F
外墙节能构造钻芯检验方法············································ 118
附录 G
正常检验抽样判定····························································122
附录 H
建筑节能分部、分项工程和检验批的质量验收表······· 124
本标准用词说明················································································128
引用标准名录····················································································129
条文说明····························································································131
Contents
1
General Provisions············································································1
2
Terms·································································································2
3
Basic Requirements·········································································· 5
3.1
Technology and Management····································································5
3.2
Materials and Equipment···········································································5
3.3
Construction and Control···········································································7
3.4
Division of Acceptance··············································································8
4
Wall Energy Efficient Project·························································10
4.1
General Requirements··············································································10
4.2
Thermal Insulation of Thermal Insulation Board···································· 13
Ⅰ
Main Control Items···············································································13
Ⅱ
General Items························································································16
4.3
Thermal Insulation of Prefabricated Composite Wall Panels
·················································································································17
Ⅰ
Main Control Items···············································································17
Ⅱ
General Items························································································21
4.4
Thermal Insulation of Other Insulation Materials·······························22
Ⅰ
Main Control Items······························································ 22
Ⅱ
General Items······································································· 25
5
Curtain Walls Energy Efficient Project·········································· 27
5.1
General Requirements··············································································27
5.2
Main Control Items··················································································29
5.3
General Items························································································· 32
6
Doors and Windows Energy Efficient Project······························· 34
6.1
General Requirements··············································································34
6.2
Main Control Items··················································································35
6.3
General Items···························································································37
7
Roofs Energy Efficient Project·······················································39
7.1
General Requirements··············································································39
7.2
Main Control Items··················································································40
7.3
General Items···························································································42
8
Ground Energy Efficient Project····················································44
8.1
General Requirements············································································ 44
8.2
Control Items··························································································· 45
8.3
General Items···························································································46
9
Heating Energy Efficient Project····················································48
9.1
General Requirements··············································································48
9.2
Main Control Items··················································································48
9.3
General Items···························································································54
10
Ventilation and Air-conditioning Energy Efficient Project
·······································································································55
10.1
General Requirements············································································55
10.2
Main Control Items················································································55
10.3
General Items·························································································63
11
Heat and Cold Source for HVAC and Pipe Network Energy
Efficient Project············································································64
11.1
General Requirements············································································64
11.2
Main Control Items················································································64
11.3
General Items························································································· 68
12
Power Distribution and Lighting Energy Efficient Project
·······································································································70
12.1
General Requirements·········································································· 70
12.2
Main Control Items················································································71
12.3
General Items·························································································73
13
Monitoring and Control Energy Efficient Project························75
13.1
General Requirements············································································75
13.2
Control Items························································································· 76
13.3
General Items·························································································81
14
Ground Source Heat Pump Heat Exchanger System Energy
Efficient Project············································································83
14.1
General Requirements············································································83
14.2
Main Control Items················································································83
14.3
General Items·························································································86
15
Solar Water Heating System Energy Efficient Project·················88
15.1
General Requirements············································································88
15.2
Main Control Items················································································88
15.3
General Items·························································································91
16
Solar Photovoltaic System Energy Efficient Project····················93
16.1
General Requirements············································································93
16.2
Main Control Items················································································93
16.3
General Items·························································································96
17 In-site Inspection of Energy Efficient Project·································97
17.1
In-site Inspection of Building Envelope················································ 97
17.2
Energy Efficient Performance Inspection of Equipment
System·································································································100
18 Acceptance for Branches of Energy Efficient Project···················102
Appendix A
Witness Sample of Building Energy-Saving Major
Material·······························································································105
Appendix B
Exterior insulation condition of acceptance of the
project started in Table········································································111
Appendix C
In-site Pull-out Test Method for Tensile Bond Strength
between Insulation Board and Base Layer·········································112
Appendix D
Peeling Test Method for Insulation Board Paste Area
Ratio ··································································································114
Appendix E
Test Method for Dry Density, Thermal Conductivity and
Compressive Strength of Insulation Slurry in the Same Curing
Condition·····························································································116
Appendix F
Test Method of Drilled Core on External Walls Structure
·············································································································118
Appendix G
Normal Inspection Sampling Determination··············122
Appendix H
Quality Acceptance List for Branch and Subdivisional
Project and Inspection Lot of Energy Efficient Project····················· 124
Explanation of Wording in This Standard··········································128
List of Quoted Standards····································································129
Explanation of Provisions···································································131
1
1
总
则
1.0.1
为加强建筑节能工程的施工质量管理,统一建筑节能工程施
工质量验收标准,保证建筑节能工程施工质量,依据国家和天津市
相关法律、法规和技术标准,结合我市实际情况制订本规程。
1.0.2
本规程适用于天津市新建、改建和扩建民用建筑节能工程的
施工质量验收。
1.0.3
本规程对建筑节能工程施工质量的要求为基本要求,相关工
程技术文件、承包合同文件对节能工程质量的要求不得低于本规程
的规定。
1.0.4
民用建筑节能工程施工质量验收除应符合本规程外,尚应符
合国家和天津市现行有关标准及规定。
2
2
术
语
2.0.1
围护结构
building envelope
分隔建筑室内与室外,以及建筑内部使用空间的建筑部件。
2.0.2
热桥